Genetic Algorithms for Construction Time-Cost-Quality Trade-Off: A Road Project Case Study

被引:0
|
作者
Sorrentino, Mariarosa [1 ]
机构
[1] Univ Bologna, Sch Engn & Architecture, Bologna, Italy
关键词
Construction Management; Key Performance Indicators (KPIs); Time-Cost-Quality trade-off analysis; road construction; Genetic Algorithms (GAs); Multi-objective Optimization;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction projects must satisfy time cost and quality requirements and Project Management is basically focused on this trade-off. In fact, in every project these three parameters are interdependent: it's impossible to change an element without conditioning at least one of the other two. The paper presents the development of a practical and automated system that uses an artificial intelligence technique for the planning of an infrastructural construction work, with the aim of optimizing time-cost-quality simultaneously. The model is developed as a multi-objective genetic algorithm to provide the capability of quantifying and considering quality in construction optimization. The purpose is to provide planners a useful technique to explore all possible project configurations.
引用
收藏
页码:163 / 176
页数:14
相关论文
共 50 条
  • [21] Using genetic algorithms to solve construction time-cost trade-off problems
    Univ of Illinois at Urbana-Champaign, Urbana, United States
    J Comput Civ Eng, 3 (184-189):
  • [22] Optimization of construction time-cost trade-off analysis using genetic algorithms
    Hegazy, T
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 1999, 26 (06) : 685 - 697
  • [23] A novel multi criteria decision making model for optimizing time-cost-quality trade-off problems in construction projects
    Monghasemi, Shahryar
    Nikoo, Mohammad Reza
    Fasaee, Mohammad Ali Khaksar
    Adamowski, Jan
    EXPERT SYSTEMS WITH APPLICATIONS, 2015, 42 (06) : 3089 - 3104
  • [24] Fuzzy Multi-Mode Time-Cost-Quality Trade-Off Optimization in Construction Management of Hydraulic Structure Projects
    Mendomo Meye, Serges
    Li, Guowei
    Shen, Zhenzhong
    Zhang, Jingbin
    APPLIED SCIENCES-BASEL, 2022, 12 (12):
  • [25] CHAOTIC INITIALIZED MULTIPLE OBJECTIVE DIFFERENTIAL EVOLUTION WITH ADAPTIVE MUTATION STRATEGY (CA-MODE) FOR CONSTRUCTION PROJECT TIME-COST-QUALITY TRADE-OFF
    Cheng, Min-Yuan
    Duc-Hoc Tran
    Cao, Minh-Tu
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016, 22 (02) : 210 - 223
  • [26] A ROBUST TIME-COST-QUALITY-ENERGY-ENVIRONMENT TRADE-OFF WITH RESOURCE-CONSTRAINED IN PROJECT MANAGEMENT: A CASE STUDY FOR A BRIDGE CONSTRUCTION PROJECT
    Lotfi, Reza
    Yadegari, Zahra
    Hosseini, Seyed Hossein
    Khameneh, Amir Hossein
    Tirkolaee, Erfan Babaee
    Weber, Gerhard-Wilhelm
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (01) : 375 - 396
  • [27] Multiple objective immune wolf colony algorithm for solving time-cost-quality trade-off problem
    Liu, Guanyi
    Li, Xuemei
    Alam, Khalid Mehmood
    PLOS ONE, 2023, 18 (02):
  • [28] Fuzzy tradeoff optimization of time-cost-quality in construction project
    Management School, Xi'an Jiaotong University, Xi'an 710049, China
    Xitong Gongcheng Lilum yu Shijian, 2006, 7 (112-117):
  • [29] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects
    Bragadin, Marco Alvise
    Pozzi, Luca
    Kahkonen, Kalle
    SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
  • [30] Utility of Genetic Algorithms for Solving Large-Scale Construction Time-Cost Trade-Off Problems
    Agdas, Duzgun
    Warne, David J.
    Osio-Norgaard, Jorge
    Masters, Forrest J.
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2018, 32 (01)