共 50 条
- [31] Application of probabilistic cost and schedule risk assessment and risk management to large infrastructure projects SAFETY AND RELIABILITY FOR MANAGING RISK, VOLS 1-3, 2006, : 2093 - +
- [35] 4 Estimating Risk Adjusted Cost or Schedule Using Fuzzy Logic INCOSE International Symposium, 1999, 9 (01): : 241 - 246
- [38] Analysis on the Transmission Type of Programe Schedule Risk ADVANCES IN CIVIL ENGINEERING, PTS 1-6, 2011, 255-260 : 3968 - 3971
- [40] An Empirical Analysis of Sources of Cost and Schedule Growth for Facilities Projects CONSTRUCTION RESEARCH CONGRESS 2020: PROJECT MANAGEMENT AND CONTROLS, MATERIALS, AND CONTRACTS, 2020, : 740 - 749