Integrated Cost-Schedule Risk Analysis

被引:0
|
作者
Smith, Nigel J.
机构
关键词
D O I
10.1680/mpal.11.00048
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:162 / 162
页数:1
相关论文
共 50 条
  • [1] Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects
    Xu, Zhe
    Yu, Jing
    Li, Hongbo
    JOURNAL OF APPLIED MATHEMATICS, 2014,
  • [2] 3.5.5 Integrated Cost / Schedule Risk Analysis
    Hulett, David T.
    Campbell, Bill
    INCOSE International Symposium, 2002, 12 (01) : 943 - 951
  • [3] Simulation based schedule and cost integrated risk of stochastic activity network
    Yang, Bao-Sen
    Liu, Lu
    Ma, Chen
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2010, 30 (11): : 2056 - 2062
  • [4] Development of quantitative cost and schedule risk analysis process
    Moses, KD
    Hooker, SF
    18th International Conference on Systems Engineering, Proceedings, 2005, : 382 - 387
  • [5] COST AND SCHEDULE ESTIMATE -RISK ANALYSIS FOR TRANSPORTATION INFRASTRUCTURES
    Cretu, Ovidiu S.
    IMECE2009: PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, VOL 13, 2010, : 331 - 340
  • [6] COST CONTROL: INTEGRATED COST/SCHEDULE PERFORMANCE.
    Stevens, Wayne M.
    Journal of Management in Engineering, 1986, 2 (03) : 157 - 164
  • [7] Analysis of the cost, schedule, and risk for Lynx mirror assembly production
    Arenberg, Jonathan W.
    Zhang, William W.
    UV, X-RAY, AND GAMMA-RAY SPACE INSTRUMENTATION FOR ASTRONOMY XXI, 2019, 11118
  • [8] Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines
    Choudhry, Rafiq M.
    Aslam, Mohammad A.
    Hinze, Jimmie W.
    Arain, Faisal M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2014, 140 (07)
  • [9] Integrated cost, quality, risk and schedule control through earned value management (EVM)
    Khesal, Tahereh
    Saghaei, Abbas
    Khalilzadeh, Mohammad
    Galankashi, Masoud Rahiminezhad
    Soltani, Roya
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2019, 17 (01) : 183 - 203
  • [10] Integrated cost and schedule control: a piece of cake
    Kibler, Bruce E.
    Cost Engineering (Morgantown, West Virginia), 1992, 34 (07): : 15 - 22