Integrated Cost-Schedule Risk Analysis

被引:0
|
作者
Smith, Nigel J.
机构
关键词
D O I
10.1680/mpal.11.00048
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:162 / 162
页数:1
相关论文
共 50 条
  • [11] Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring
    Acebes, Fernando
    Pajares, Javier
    Manuel Galan, Jose
    Lopez-Paredes, Adolfo
    SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 181 - 189
  • [12] Revolutionizing project control: leveraging control theory for integrated cost, schedule, and risk management
    Brahim Seddiki
    Discover Civil Engineering, 2 (1):
  • [13] SCHEDULE RISK ANALYSIS
    CAMPBELL, DW
    AACE BULLETIN, 1972, 14 (02): : 49 - &
  • [14] Integrated Schedule and Cost Model for Repetitive Construction Process
    Cho, Kyuman
    Hong, Taehoon
    Hyun, Changtaek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2010, 26 (02) : 78 - 88
  • [15] Flexible work breakdown structure for integrated cost and schedule control
    Jung, Y
    Woo, S
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (05): : 616 - 625
  • [16] Integrated cost and schedule control: a survey of experience in UK industry
    Webb, Alan
    Engineering Management Journal, 1995, 5 (03): : 111 - 116
  • [17] Integrated management and optimization of construction project schedule, cost and quality
    Zhan Xiaran
    2018 INTERNATIONAL WORKSHOP ON ADVANCES IN SOCIAL SCIENCES (IWASS 2018), 2019, : 622 - 625
  • [18] The Integrated Optimization Management of Project's Quality, Schedule, Cost
    Huang, Dong
    Cai, Wanqu
    Cheng, Cong
    CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1280 - 1286
  • [19] Research on risk analysis for construction project schedule and cost based on Monte Carlo simulation
    Zhong Zuowei
    Xi Bao
    Huang Qiugu
    Yang Shihua
    Li Fangzhen
    Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 857 - 861
  • [20] Integrated control of the project cost and schedule based on CPM by EVA and WBS
    Yan Hui
    Wang Yaowu
    Zhang Lei
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 431 - 433