共 50 条
- [11] Beyond Earned Value Management: A Graphical Framework for Integrated Cost, Schedule and Risk Monitoring SELECTED PAPERS FROM THE 26TH IPMA (INTERNATIONAL PROJECT MANAGEMENT ASSOCIATION), WORLD CONGRESS, 2013, 74 : 181 - 189
- [12] Revolutionizing project control: leveraging control theory for integrated cost, schedule, and risk management Discover Civil Engineering, 2 (1):
- [15] Flexible work breakdown structure for integrated cost and schedule control JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2004, 130 (05): : 616 - 625
- [16] Integrated cost and schedule control: a survey of experience in UK industry Engineering Management Journal, 1995, 5 (03): : 111 - 116
- [17] Integrated management and optimization of construction project schedule, cost and quality 2018 INTERNATIONAL WORKSHOP ON ADVANCES IN SOCIAL SCIENCES (IWASS 2018), 2019, : 622 - 625
- [18] The Integrated Optimization Management of Project's Quality, Schedule, Cost CONFERENCE PROCEEDINGS OF THE 6TH INTERNATIONAL SYMPOSIUM ON PROJECT MANAGEMENT (ISPM2018), 2018, : 1280 - 1286
- [19] Research on risk analysis for construction project schedule and cost based on Monte Carlo simulation Proceedings of 2006 International Conference on Construction & Real Estate Management, Vols 1 and 2: COLLABORATION AND DEVELOPMENT IN CONSTRUCTION AND REAL ESTATE, 2006, : 857 - 861
- [20] Integrated control of the project cost and schedule based on CPM by EVA and WBS Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 431 - 433