Risk assessment method of major unsafe hydroelectric project

被引:0
|
作者
ZhongRu Wu
HuaiZhi Su
HaiQing Guo
机构
[1] College of Water Conservancy and Hydropower Engineering of Hohai University,
[2] National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety,undefined
关键词
major unsafe hydroelectric project; operation risk; analysis method;
D O I
暂无
中图分类号
学科分类号
摘要
Based on the characteristics of major unsafe hydroelectric projects and the data from field detection, in situ monitoring, and regular safety inspection, the fundamental principles of operation risk assessment are proposed in this paper. Meanwhile, a three layer hierarchical system is constructed, and an improved analytical hierarchical process combining genetic algorithm and analytical hierarchical process is established, with corresponding program. The operation risk of some unsafe dam was assessed with the principles, method and program presented in this paper and the major factors which would affect the operation of the dam were pointed out.
引用
收藏
页码:1345 / 1352
页数:7
相关论文
共 50 条
  • [1] Risk assessment method of major unsafe hydroelectric project
    WU ZhongRu1
    2 National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety
    Science in China(Series E:Technological Sciences), 2008, (09) : 1345 - 1352
  • [2] Risk assessment method of major unsafe hydroelectric project
    Wu ZhongRu
    Su HuaiZhi
    Guo HaiQing
    SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2008, 51 (09): : 1345 - 1352
  • [3] MAJOR PROJECT RISK ASSESSMENT METHOD BASED ON BP NEURAL NETWORK
    Liu, Lidong
    Wei, Fajie
    Zhou, Shenghan
    DISCRETE AND CONTINUOUS DYNAMICAL SYSTEMS-SERIES S, 2019, 12 (4-5): : 1053 - 1064
  • [4] Multi-criteria risk assessment: Case study of a large hydroelectric project
    Ribas, Jose Roberto
    Arce, Maria Elena
    Sohler, Flavio Augusto
    Suarez-Garcia, Andres
    JOURNAL OF CLEANER PRODUCTION, 2019, 227 : 237 - 247
  • [5] Data and calculation approach of the fuzzy AHP risk assessment of a large hydroelectric project
    Ribas, Jose Roberto
    Elena Arce, Maria
    Sohler, Flavio Augusto
    Suarez-Garcia, Andres
    DATA IN BRIEF, 2019, 25
  • [6] An Analysis on Key Problems of Safety Assessment of High Risk Operations in Hydroelectric Project
    Zhou, JianLan
    Sun, ZhiYu
    Tang, DaWei
    ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEMS AND MATERIAL ENGINEERING, PTS 1-7, 2011, 204-210 : 148 - +
  • [7] A LEC-and-AHP Based Hazard Assessment Method in Hydroelectric Project Construction
    Zhou, Jian-lan
    Tang, Da-wei
    Liu, Xian-rong
    Gong, Sheng-yu
    SIXTH INTERNATIONAL SYMPOSIUM ON NEURAL NETWORKS (ISNN 2009), 2009, 56 : 81 - +
  • [8] Risk assessment method for submerged weeds in New Zealand hydroelectric lakes
    Clayton, J.
    Champion, P.
    HYDROBIOLOGIA, 2006, 570 (1) : 183 - 188
  • [9] Risk assessment of an overflow of the diversion structure of the El Cajon hydroelectric project in Nayarit, Mexico
    Marengo, Humberto
    Morales, Victor
    INGENIERIA HIDRAULICA EN MEXICO, 2008, 23 (02): : 75 - 89
  • [10] Risk assessment method for submerged weeds in New Zealand hydroelectric lakes
    J. Clayton
    P. Champion
    Hydrobiologia, 2006, 570 : 183 - 188