MAJOR PROJECT RISK ASSESSMENT METHOD BASED ON BP NEURAL NETWORK

被引:9
|
作者
Liu, Lidong [1 ]
Wei, Fajie [1 ]
Zhou, Shenghan [2 ]
机构
[1] Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China
[2] Beihang Univ, Sch Reliabil & Syst Engn, Beijing 100191, Peoples R China
来源
基金
中国国家自然科学基金;
关键词
Major project; risk assessment; BP neural network; particle swarm optimization; index system; DOLPHINS TURSIOPS-TRUNCATUS; MODEL; PREDICTION; PSO; OPTIMIZATION; TEMPERATURE; HEALTH;
D O I
10.3934/dcdss.2019072
中图分类号
O29 [应用数学];
学科分类号
070104 ;
摘要
In order to prevent risks in major projects, it is of great importance to accurately assess risks in advance. Therefore, in this paper, we propose a novel major project risk assessment method with the BP neural network model. Firstly, we propose an index system for major project risk assessment, which is made up of four parts: 1) Schedule risk, 2) Cost risk, 3) Quality risk, and 4) Resource risk. Secondly, we propose a hybrid BP neural network and particle swarm optimization (PSO) model to evaluate risks in major projects. Especially, major project risk assessment results are achieved from the output layers of the BP neural network which is optimized by the PSO algorithm. In our proposed hybrid model, the fitness for each particle is computed through an optimal function, and then the particle can improve its velocity for the next cycle by searching the optimal value. Furthermore, this process should be repeated when the end condition is satisfied. Finally, experimental results demonstrate that the proposed method is able to evaluate risk level of major projects with high accuracy.
引用
收藏
页码:1053 / 1064
页数:12
相关论文
共 50 条
  • [1] The Model of Project Risk Assessment Based on BP Neural Network Algorithm
    Bai, Lei
    Li, Fuling
    2013 3RD INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2013, : 326 - 329
  • [2] Study on the Risk Assessment of Real Estate Project Based on BP Neural Network
    Zhang Xuefang
    Ji Wei
    2010 2ND IEEE INTERNATIONAL CONFERENCE ON INFORMATION AND FINANCIAL ENGINEERING (ICIFE), 2010, : 535 - 537
  • [3] Risk Assessment of Coal Mine Construction Project Based on BP Neural Network
    Yang, Renshu
    Wang, Xuegui
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 2197 - 2200
  • [4] Safety Risk Assessment of Highway Special Maintenance Project Based on BP Neural Network
    Tian, Wei
    Li, Huimin
    Yan, Ruiqi
    Hu, Yunxiang
    ADVANCES IN CIVIL ENGINEERING AND ARCHITECTURE INNOVATION, PTS 1-6, 2012, 368-373 : 3175 - 3179
  • [5] Flight Operation Risk Assessment Method Based on BP Neural Network Algorithm
    Yu Liling
    Xiao Xianbo
    Wang Haofeng
    Li Bin
    Xu Xiangsong
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL. VIII, PTS A AND B, 2010, 8 : 200 - 206
  • [6] A Risk Assessment Model of Flood Based on Information Diffusion Method and BP Neural Network
    Chen, Junfei
    Jin, Qiongji
    Wang, Huimin
    Zhao, Shufang
    PRZEGLAD ELEKTROTECHNICZNY, 2012, 88 (9B): : 33 - 36
  • [7] Network Situation Assessment Method Based on Improved BP Neural Network
    Du, Zhiqiang
    Yao, Haitao
    Fu, Yanfang
    Cao, Zijian
    Liang, Hongtao
    Ren, Jinkang
    ELECTRONICS, 2023, 12 (03)
  • [8] Risk assessment of logistics outsourcing based on BP neural network
    Liu Xiao-feng
    Tian Zi-you
    PIAGENG 2013: INTELLIGENT INFORMATION, CONTROL, AND COMMUNICATION TECHNOLOGY FOR AGRICULTURAL ENGINEERING, 2013, 8762
  • [9] Risk Assessment of Supply chain Based on BP Neural Network
    Wang, Ying
    Huang, Lei
    2009 SECOND INTERNATIONAL SYMPOSIUM ON KNOWLEDGE ACQUISITION AND MODELING: KAM 2009, VOL 2, 2009, : 186 - 188
  • [10] Research of Landslide Risk Assessment Based on BP Neural Network
    Wang, Meng
    Qiao, Jian-Ping
    Shi, Li-Li
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 5343 - 5349