A LEC-and-AHP Based Hazard Assessment Method in Hydroelectric Project Construction

被引:0
|
作者
Zhou, Jian-lan [1 ,2 ]
Tang, Da-wei [2 ]
Liu, Xian-rong [1 ]
Gong, Sheng-yu [3 ]
机构
[1] China Three Gorges Project Corp, Dept Work Safety, Yichang 443002, Peoples R China
[2] Huazhong Univ Sci & Technol, Inst Syst & Engn, Wuhan 430074, Peoples R China
[3] Sinohydro Engn Bur 3, Ankang 725011, Peoples R China
关键词
Hydroelectric project construction; Hazard assessment; LEC; AHP; Statistical data on accidents;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Aiming at the defects of simply using LEC method to evaluate the risk factors in working system, this paper thoroughly analyses the main factors which can influence the hazard assessment; adapts LEC and AHP assessment methods with the combination of the former accident cases and experts' experiences; associates multiple factors that can lead to accidents, assigns reasonable weights, thus determines the importance order of the factors. The statistical data verifies that the above method implements the quantitative assessment objectively, which can guarantee the consistency of the evaluation result and statistical data.
引用
收藏
页码:81 / +
页数:2
相关论文
共 50 条
  • [1] The study of Green Risk Assessment for Construction Project Based on "AHP-FCE" Method
    Xie Danfeng
    Guo Shurong
    Li Sulei
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON SUSTAINABLE CONSTRUCTION & RISK MANAGEMENT, VOLS I AND II, 2010, : 130 - 134
  • [2] A Method Used for Quality Assessment of Construction Project Based on FCE and Group-decision AHP
    Shi Huawang
    PROCEEDINGS OF THE SECOND INTERNATIONAL SYMPOSIUM ON ELECTRONIC COMMERCE AND SECURITY, VOL II, 2009, : 333 - 336
  • [3] Based on the AHP Method Analysis the Factors about the Quality of Construction Project
    Li, Peng
    CIVIL, STRUCTURAL AND ENVIRONMENTAL ENGINEERING, PTS 1-4, 2014, 838-841 : 3151 - 3155
  • [4] Data and calculation approach of the fuzzy AHP risk assessment of a large hydroelectric project
    Ribas, Jose Roberto
    Elena Arce, Maria
    Sohler, Flavio Augusto
    Suarez-Garcia, Andres
    DATA IN BRIEF, 2019, 25
  • [5] Risk assessment method of major unsafe hydroelectric project
    WU ZhongRu1
    2 National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety
    Science in China(Series E:Technological Sciences), 2008, (09) : 1345 - 1352
  • [6] Application of Modified LEC Method in the Large Municipal Bridge Construction Hazard Evaluation
    Zeng, Xianyun
    Yin, Hang
    Li, Yuanfu
    2015 8TH INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND DESIGN (ISCID), VOL 2, 2015, : 614 - 617
  • [7] Risk assessment method of major unsafe hydroelectric project
    Wu ZhongRu
    Su HuaiZhi
    Guo HaiQing
    SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2008, 51 (09): : 1345 - 1352
  • [8] Risk assessment method of major unsafe hydroelectric project
    ZhongRu Wu
    HuaiZhi Su
    HaiQing Guo
    Science in China Series E: Technological Sciences, 2008, 51 : 1345 - 1352
  • [9] Risk Assessment Method of ERP Project Based on Risk Matrix and AHP
    Yang, Xiaoping
    Zhuang, Qiaojuan
    He, Miao-Hua
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 473 - 476
  • [10] AHP-based Method for Military Defence Project Risk Assessment
    Liu, Baohua
    ADVANCES IN CIVIL ENGINEERING, PTS 1-4, 2011, 90-93 : 3039 - 3042