Risk assessment method of major unsafe hydroelectric project

被引:0
|
作者
ZhongRu Wu
HuaiZhi Su
HaiQing Guo
机构
[1] College of Water Conservancy and Hydropower Engineering of Hohai University,
[2] National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety,undefined
关键词
major unsafe hydroelectric project; operation risk; analysis method;
D O I
暂无
中图分类号
学科分类号
摘要
Based on the characteristics of major unsafe hydroelectric projects and the data from field detection, in situ monitoring, and regular safety inspection, the fundamental principles of operation risk assessment are proposed in this paper. Meanwhile, a three layer hierarchical system is constructed, and an improved analytical hierarchical process combining genetic algorithm and analytical hierarchical process is established, with corresponding program. The operation risk of some unsafe dam was assessed with the principles, method and program presented in this paper and the major factors which would affect the operation of the dam were pointed out.
引用
收藏
页码:1345 / 1352
页数:7
相关论文
共 50 条
  • [11] An Analysis on risk factors of high risk operations in hydroelectric project
    Zhou Jian-lan
    Qin Li-fang
    Sun Zhi-yu
    MEASURING TECHNOLOGY AND MECHATRONICS AUTOMATION, PTS 1 AND 2, 2011, 48-49 : 179 - +
  • [12] Modification of risk assessment method of major hazards
    Wu, ZZ
    Zhang, Z
    PROGRESS IN SAFETY SCIENCE AND TECHNOLOGY, VOL V, PTS A AND B, 2005, 5 : 1363 - 1369
  • [13] Flow Assessment Downstream of a Hydroelectric Project in an Ungauged Area
    Devi, Dipsikha
    Sarma, Arup Kumar
    JOURNAL OF HYDROLOGIC ENGINEERING, 2023, 28 (11)
  • [14] Study and assessment of migration sustainability in hydroelectric power project
    Sun Zhonggen
    Hu Zijiang
    Han Xiao
    RENEWABLE AND SUSTAINABLE ENERGY, PTS 1-7, 2012, 347-353 : 2943 - 2948
  • [15] USING THE RISK-LIST METHOD FOR RISK ASSESSMENT IN THE PROJECT
    Kozien, Ewa
    ECONOMIC AND SOCIAL DEVELOPMENT (ESD 2018): 31ST INTERNATIONAL SCIENTIFIC CONFERENCE ON ECONOMIC AND SOCIAL DEVELOPMENT - "LEGAL CHALLENGES OF MODERN WORLD", 2018, : 152 - 158
  • [16] Tocoma dam: The last major hydroelectric project on the lower Caroni river
    Lombano, A.
    Martinez, E.
    Patĩo, A.
    International Journal on Hydropower and Dams, 2007, 14 (02): : 50 - 53
  • [17] EFFECTIVE RISK AND CONSEQUENCE ASSESSMENT FOR MAJOR HAZARDS AND PROJECT DESIGN EVALUATION
    Fearnley, Jo
    HAZARDS XXII: PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2011, (156): : 327 - 330
  • [18] Project logistics risk assessment based on the fuzzy comprehensive assessment method
    Jun, Zhang
    TENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I AND II, 2011, : 1008 - 1012
  • [19] Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia
    Turan, Faiz Mohd
    Johan, Kartina
    INTERNATIONAL RESEARCH AND INNOVATION SUMMIT (IRIS2017), 2017, 226
  • [20] Risk Assessment of Venture Investment Project Based on Risk Matrix Method
    Xing Lixian
    Li Yanhong
    Yan Xingxing
    PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON RISK MANAGEMENT & ENGINEERING MANAGEMENT, VOLS 1 AND 2, 2008, : 201 - 205