共 50 条
- [21] Risk Assessment Method of ERP Project Based on Risk Matrix and AHP PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 473 - 476
- [22] Risk failure analysis due to overtopping of the hydroelectric project Infiernillo 2000, Ing Hidraulica en Mex, Morelos, Mexico (15):
- [24] Research advances in risk assessment and enforcement of unsafe reservoirs Zheng, C. (zccxaut@163.com), 1600, International Research and Training Center on Erosion and Sedimentation and China Water and Power Press (25):
- [25] Seismotectonic considerations in the design of a major hydroelectric project in the Indo-Nepal Himalaya EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, 1998, : 783 - 787
- [27] CARHUAQUERO HYDROELECTRIC PROJECT PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-WATER MARITIME AND ENERGY, 1994, 106 (01): : 1 - 24
- [29] PETENWELL HYDROELECTRIC PROJECT TRANSACTIONS OF THE AMERICAN SOCIETY OF CIVIL ENGINEERS, 1952, 117 : 528 - 542