Contested Knowledges in Hydroelectric Project Assessment: The Case of Canada's Site C Project

被引:23
|
作者
Bakker, Karen [1 ]
Hendriks, Richard [2 ]
机构
[1] Univ British Columbia, Dept Geog, Vancouver, BC V6T 1Z2, Canada
[2] Univ Toronto, Dept Civil & Mineral Engn, Toronto, ON M5S 1A4, Canada
关键词
hydroelectric development; hydropower; dam; indigenous peoples; first nations; Canada; Site C; British Columbia; environmental impacts; socio-economic impacts; LARGE DAMS; IMPACTS;
D O I
10.3390/w11030406
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper analyzes contestation over aspects of the Site C Project on the Peace River in northeastern British Columbia, Canada. The $10.7 billion project, which is now under construction, has been vigorously debated for over 30 years. Initially proposed in the 1980s, project approval was not granted following review by the BC Utilities Commission, as the need for the project was not established. In 2010, the provincial government enacted legislation to exempt the project from future review by the BC Utilities Commission; an environmental assessment was initiated in 2012 and a constrained review by the Commission was undertaken in 2017, after construction had commenced. The paper explores key examples of contested knowledge regimes within the review process, focusing on debates over cumulative effects and greenhouse gas emissions. The analysis provides technical examples of the ways in which differing societal values are deployed and co-produced within regulatory processes.
引用
收藏
页数:18
相关论文
共 50 条
  • [1] Environmental issues block hydroelectric project: A case study of Baspa-I Hydroelectric Project
    Sharma, RC
    Bansal, SP
    Attri, V
    HYDROPOWER '97, 1997, : 79 - 84
  • [2] Influence of the proposed Site C hydroelectric project on the ice regime of the Peace River
    Jasek, Martin
    Pryse-Phillips, Amy
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2015, 42 (09) : 645 - 655
  • [3] Panama's polemic hydroelectric project
    Burton, Adrian
    FRONTIERS IN ECOLOGY AND THE ENVIRONMENT, 2009, 7 (05) : 233 - 233
  • [4] Multi-criteria risk assessment: Case study of a large hydroelectric project
    Ribas, Jose Roberto
    Arce, Maria Elena
    Sohler, Flavio Augusto
    Suarez-Garcia, Andres
    JOURNAL OF CLEANER PRODUCTION, 2019, 227 : 237 - 247
  • [5] Risk assessment method of major unsafe hydroelectric project
    WU ZhongRu1
    2 National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety
    Science in China(Series E:Technological Sciences), 2008, (09) : 1345 - 1352
  • [6] Flow Assessment Downstream of a Hydroelectric Project in an Ungauged Area
    Devi, Dipsikha
    Sarma, Arup Kumar
    JOURNAL OF HYDROLOGIC ENGINEERING, 2023, 28 (11)
  • [7] Study and assessment of migration sustainability in hydroelectric power project
    Sun Zhonggen
    Hu Zijiang
    Han Xiao
    RENEWABLE AND SUSTAINABLE ENERGY, PTS 1-7, 2012, 347-353 : 2943 - 2948
  • [8] Risk assessment method of major unsafe hydroelectric project
    Wu ZhongRu
    Su HuaiZhi
    Guo HaiQing
    SCIENCE IN CHINA SERIES E-TECHNOLOGICAL SCIENCES, 2008, 51 (09): : 1345 - 1352
  • [9] Risk assessment method of major unsafe hydroelectric project
    ZhongRu Wu
    HuaiZhi Su
    HaiQing Guo
    Science in China Series E: Technological Sciences, 2008, 51 : 1345 - 1352
  • [10] Extensive stress measurements program at the Toulnustouc hydroelectric project - Quebec, Canada
    Rancourt, A. J.
    Murphy, D. K.
    Whalen, A.
    Benson, R.
    IN-SITU ROCK STRESS MEASUREMENT, INTERPRETATION AND APPLICATION, 2006, : 25 - 33