Contested Knowledges in Hydroelectric Project Assessment: The Case of Canada's Site C Project

被引:23
|
作者
Bakker, Karen [1 ]
Hendriks, Richard [2 ]
机构
[1] Univ British Columbia, Dept Geog, Vancouver, BC V6T 1Z2, Canada
[2] Univ Toronto, Dept Civil & Mineral Engn, Toronto, ON M5S 1A4, Canada
关键词
hydroelectric development; hydropower; dam; indigenous peoples; first nations; Canada; Site C; British Columbia; environmental impacts; socio-economic impacts; LARGE DAMS; IMPACTS;
D O I
10.3390/w11030406
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper analyzes contestation over aspects of the Site C Project on the Peace River in northeastern British Columbia, Canada. The $10.7 billion project, which is now under construction, has been vigorously debated for over 30 years. Initially proposed in the 1980s, project approval was not granted following review by the BC Utilities Commission, as the need for the project was not established. In 2010, the provincial government enacted legislation to exempt the project from future review by the BC Utilities Commission; an environmental assessment was initiated in 2012 and a constrained review by the Commission was undertaken in 2017, after construction had commenced. The paper explores key examples of contested knowledge regimes within the review process, focusing on debates over cumulative effects and greenhouse gas emissions. The analysis provides technical examples of the ways in which differing societal values are deployed and co-produced within regulatory processes.
引用
收藏
页数:18
相关论文
共 50 条
  • [21] Canada's offer to host the ITER project
    Rae, RK
    FUSION ENGINEERING AND DESIGN, 2003, 69 (1-4) : 545 - 552
  • [22] Canada's bilingual Constitution: an unfinished project
    Zekri, Catherine
    META, 2019, 64 (01) : 293 - 296
  • [23] Canada's bilingual constitution, an unfinished project
    Desaulniers, Antoine Brousseau
    RECHERCHES SOCIOGRAPHIQUES, 2019, 60 (03) : 687 - 688
  • [24] VON Canada's Seniors Health Project
    Schuehlein, S
    JOURNAL OF AGING AND PHYSICAL ACTIVITY, 2004, 12 (03) : 276 - 276
  • [26] The importance of cultural aspects in impact assessment and project development: reflections from a case study of a hydroelectric dam in Brazil
    Hanna, Philippe
    Vanclay, Frank
    Langdon, Esther Jean
    Arts, Jos
    IMPACT ASSESSMENT AND PROJECT APPRAISAL, 2016, 34 (04) : 306 - 318
  • [27] A LEC-and-AHP Based Hazard Assessment Method in Hydroelectric Project Construction
    Zhou, Jian-lan
    Tang, Da-wei
    Liu, Xian-rong
    Gong, Sheng-yu
    SIXTH INTERNATIONAL SYMPOSIUM ON NEURAL NETWORKS (ISNN 2009), 2009, 56 : 81 - +
  • [28] Data and calculation approach of the fuzzy AHP risk assessment of a large hydroelectric project
    Ribas, Jose Roberto
    Elena Arce, Maria
    Sohler, Flavio Augusto
    Suarez-Garcia, Andres
    DATA IN BRIEF, 2019, 25
  • [29] ENVIRONMENTAL-IMPACT OF CHURCHILL FALLS (LABRADOR) HYDROELECTRIC PROJECT - PRELIMINARY ASSESSMENT
    DUTHIE, HC
    OSTROFSKY, ML
    JOURNAL OF THE FISHERIES RESEARCH BOARD OF CANADA, 1975, 32 (01): : 117 - 125
  • [30] An Analysis on Key Problems of Safety Assessment of High Risk Operations in Hydroelectric Project
    Zhou, JianLan
    Sun, ZhiYu
    Tang, DaWei
    ADVANCED RESEARCH ON INDUSTRY, INFORMATION SYSTEMS AND MATERIAL ENGINEERING, PTS 1-7, 2011, 204-210 : 148 - +