Contested Knowledges in Hydroelectric Project Assessment: The Case of Canada's Site C Project

被引:23
|
作者
Bakker, Karen [1 ]
Hendriks, Richard [2 ]
机构
[1] Univ British Columbia, Dept Geog, Vancouver, BC V6T 1Z2, Canada
[2] Univ Toronto, Dept Civil & Mineral Engn, Toronto, ON M5S 1A4, Canada
关键词
hydroelectric development; hydropower; dam; indigenous peoples; first nations; Canada; Site C; British Columbia; environmental impacts; socio-economic impacts; LARGE DAMS; IMPACTS;
D O I
10.3390/w11030406
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper analyzes contestation over aspects of the Site C Project on the Peace River in northeastern British Columbia, Canada. The $10.7 billion project, which is now under construction, has been vigorously debated for over 30 years. Initially proposed in the 1980s, project approval was not granted following review by the BC Utilities Commission, as the need for the project was not established. In 2010, the provincial government enacted legislation to exempt the project from future review by the BC Utilities Commission; an environmental assessment was initiated in 2012 and a constrained review by the Commission was undertaken in 2017, after construction had commenced. The paper explores key examples of contested knowledge regimes within the review process, focusing on debates over cumulative effects and greenhouse gas emissions. The analysis provides technical examples of the ways in which differing societal values are deployed and co-produced within regulatory processes.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] The ERP Project Risk Assessment - A case study
    Iskanius, Paivi
    WORLD CONGRESS ON ENGINEERING 2009, VOLS I AND II, 2009, : 752 - 756
  • [42] Contested rural futures: New Zealand's East Coast Forestry Project
    Cocklin, C
    Wall, M
    JOURNAL OF RURAL STUDIES, 1997, 13 (02) : 149 - 162
  • [43] Case Study and Numerical Analysis of Vibration and Runner Cracks for the Lipno I Hydroelectric Project
    Zouhar, J.
    Obrovsky, J.
    Feilhauer, M.
    Skotak, A.
    28TH IAHR SYMPOSIUM ON HYDRAULIC MACHINERY AND SYSTEMS (IAHR2016), PTS 1-12, 2016, 49
  • [44] A SMART CITY ASSESSMENT FRAMEWORK: THE CASE OF ISTANBUL'S SMART CITY PROJECT
    Canitez, Fatih
    Deveci, Muhammet
    ECONOMIC AND SOCIAL DEVELOPMENT (ESD 2018): 32ND INTERNATIONAL SCIENTIFIC CONFERENCE ON ECONOMIC AND SOCIAL DEVELOPMENT, 2018, : 369 - 380
  • [45] Risk assessment of MUSTANG project experimental site - Methodological development
    Dias, Stephanie
    Le Guen, Yvi
    Poupard, Olivier
    Shtivelman, Vladimir
    10TH INTERNATIONAL CONFERENCE ON GREENHOUSE GAS CONTROL TECHNOLOGIES, 2011, 4 : 4109 - 4116
  • [46] ENVIRONMENTAL ASSESSMENT OF SITE SELECTION AND PROJECT PLANNING INDICATORS IN BEAS
    Eva, Kridlova Burdova
    Silvia, Vilcekova
    11TH INTERNATIONAL MULTIDISCIPLINARY SCIENTIFIC GEOCONFERENCE (SGEM 2011), VOL III, 2011, : 303 - 310
  • [47] Saints preserve! Project Restore's Web site
    Oldenburg, D
    PRESERVATION, 1999, 51 (06): : 22 - 22
  • [48] Site-Specific Geotechnical Resistance Factors for a Large Industrial Project in Canada
    Thomson, Peter
    Becker, Dennis
    Esposito, Gennaro
    Wright, Jim J.
    GEO-RISK 2017: RELIABILITY-BASED DESIGN AND CODE DEVELOPMENTS, 2017, (283): : 329 - 340
  • [49] Project delivery trends: A contractor's assessment
    Mulvey, DL
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1998, 14 (06) : 51 - 54
  • [50] Project delivery trends: A contractor's assessment
    McGough Construction Co Inc, St. Paul, United States
    J Manage Eng, 6 (51-54):