Contested Knowledges in Hydroelectric Project Assessment: The Case of Canada's Site C Project

被引:23
|
作者
Bakker, Karen [1 ]
Hendriks, Richard [2 ]
机构
[1] Univ British Columbia, Dept Geog, Vancouver, BC V6T 1Z2, Canada
[2] Univ Toronto, Dept Civil & Mineral Engn, Toronto, ON M5S 1A4, Canada
关键词
hydroelectric development; hydropower; dam; indigenous peoples; first nations; Canada; Site C; British Columbia; environmental impacts; socio-economic impacts; LARGE DAMS; IMPACTS;
D O I
10.3390/w11030406
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper analyzes contestation over aspects of the Site C Project on the Peace River in northeastern British Columbia, Canada. The $10.7 billion project, which is now under construction, has been vigorously debated for over 30 years. Initially proposed in the 1980s, project approval was not granted following review by the BC Utilities Commission, as the need for the project was not established. In 2010, the provincial government enacted legislation to exempt the project from future review by the BC Utilities Commission; an environmental assessment was initiated in 2012 and a constrained review by the Commission was undertaken in 2017, after construction had commenced. The paper explores key examples of contested knowledge regimes within the review process, focusing on debates over cumulative effects and greenhouse gas emissions. The analysis provides technical examples of the ways in which differing societal values are deployed and co-produced within regulatory processes.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Knowledge management on site: a case study project
    Wilkinson, Robert
    Sherratt, Fred
    Farrell, Peter
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2015, 168 (02) : 99 - 109
  • [32] PROJECT'S ASSESSMENT PRINCIPLES AND STRATEGIES
    Moutinho, Nuno
    Mouta, Helena
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON PROJECT EVALUATION (ICOPEV 2016), 2016, : 225 - 229
  • [33] Incorporating Project Complexities in Risk Assessment: Case of an Airport Expansion Construction Project
    Andringa, Lise
    Okmen, Onder
    Leijten, Martijn
    Bosch-Rekveldt, Marian
    Bakker, Hans
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2022, 38 (06)
  • [34] Value of Project Management - a Value Assessment Based Case Study for Software Project
    Ojala, Pasi
    PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON MANAGEMENT, MARKETING AND FINANCES, 2009, : 25 - 31
  • [35] Risk assessment of an overflow of the diversion structure of the El Cajon hydroelectric project in Nayarit, Mexico
    Marengo, Humberto
    Morales, Victor
    INGENIERIA HIDRAULICA EN MEXICO, 2008, 23 (02): : 75 - 89
  • [36] Tree Canada's Forest Carbon Project Protocol
    不详
    FORESTRY CHRONICLE, 2009, 85 (05): : 689 - 689
  • [37] Partner the Project-6 C's for Excellence in Project Delivery
    Peters, Lee A.
    JOURNAL OF LEGAL AFFAIRS AND DISPUTE RESOLUTION IN ENGINEERING AND CONSTRUCTION, 2011, 3 (04) : 147 - 151
  • [38] The cost effectiveness of new reservoir hydroelectricity: British Columbia?s Site C project
    Dolter, Brett
    Fellows, G. Kent
    Rivers, Nicholas
    ENERGY POLICY, 2022, 169
  • [39] Mapping and Managing Organization Objectives: A Case Study of the Alto Maipo Hydroelectric Project in Chile
    Walters, Jeffrey P.
    Alcayaga, Hernan
    Busco, Carolina
    Araya, Tamara
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2021, 147 (11)
  • [40] C.A.S.E. Project
    Ruatti, Renato
    LOTUS INTERNATIONAL, 2010, 144 : 60 - 71