Resource-constrained Scheduling of a Real Project from the Construction Industry: A Comparison of Software Packages for Project Management

被引:4
|
作者
Trautmann, N. [1 ]
Baumann, P. [1 ]
机构
[1] Univ Bern, Dept Business Adm, Bern, Switzerland
关键词
Project management; resource-constrained scheduling; construction industry; software; ALLOCATION; MICROCOMPUTER;
D O I
10.1109/IEEM.2009.5373255
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Commercial software packages for project management apply proprietary, heuristic procedures for resource-constrained scheduling. We analyze the scheduling performance of seven such packages. Three of them offer the possibility to select the priority rule to be used for the resource-constrained scheduling procedure. The project duration obtained strongly depends on this rule. Some packages know several thousand priority rules; in general, it is impossible to predict which rule provides the best result for a given project. By analyzing 1560 projects of an internationally recognized benchmark library, we propose a set of three rules for each package. We apply these rules to a real project from the construction industry. For each of the three packages, the project duration obtained by this set of rules is among the best results for all available rules, and is shorter than the project duration obtained by the packages which do not offer alternative priority rules.
引用
收藏
页码:628 / 632
页数:5
相关论文
共 50 条
  • [31] Coordinating supplier selection and project scheduling in resource-constrained construction supply chains
    Chen, Weiwei
    Lei, Lei
    Wang, Zhengwei
    Teng, Mingfei
    Liu, Junming
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (19) : 6512 - 6526
  • [32] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Liu, Wanlin
    Ge, Li
    Qu, Chunli
    Yang, Shun
    KSCE JOURNAL OF CIVIL ENGINEERING, 2024, 28 (01) : 15 - 28
  • [33] Multidirectional Scheduling Scheme in Resource-Constrained Project Scheduling Problem
    Yoosefzadeh, Hamid R.
    Tareghian, Hamed R.
    Farahi, Mohammad H.
    NAVAL RESEARCH LOGISTICS, 2014, 61 (01) : 44 - 55
  • [34] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [35] Network decomposition techniques for resource-constrained project scheduling
    Sprecher, A
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (04) : 405 - 414
  • [36] A Neurogenetic approach for the resource-constrained project scheduling problem
    Agarwal, Anurag
    Colak, Selcuk
    Erenguc, Selcuk
    COMPUTERS & OPERATIONS RESEARCH, 2011, 38 (01) : 44 - 50
  • [37] Multimode resource-constrained project scheduling in flexible projects
    Kosztyan, Zsolt T.
    Szalkai, Istvan
    JOURNAL OF GLOBAL OPTIMIZATION, 2020, 76 (01) : 211 - 241
  • [38] Genetic algorithm for the resource-constrained project scheduling problem
    E. N. Goncharov
    V. V. Leonov
    Automation and Remote Control, 2017, 78 : 1101 - 1114
  • [39] New strategies for stochastic resource-constrained project scheduling
    Salim Rostami
    Stefan Creemers
    Roel Leus
    Journal of Scheduling, 2018, 21 : 349 - 365
  • [40] A competitive genetic algorithm for resource-constrained project scheduling
    Hartmann, S
    NAVAL RESEARCH LOGISTICS, 1998, 45 (07) : 733 - 750