Multimode resource-constrained project scheduling in flexible projects

被引:13
|
作者
Kosztyan, Zsolt T. [1 ]
Szalkai, Istvan [2 ]
机构
[1] Univ Pannonia, Fac Business & Econ, Dept Quantitat Methods, Egyet Str 10, Veszprem, Hungary
[2] Univ Pannonia, Fac Informat Technol, Dept Math, Egyet Str 10, Veszprem, Hungary
关键词
Multimode resource-constrained project scheduling problem; Flexible project management approaches; Matrix-based project planning; COST TRADEOFF PROBLEM; DISCRETE-TIME; OFF PROBLEMS; QUALITY; MODELS; AGILE;
D O I
10.1007/s10898-019-00832-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Flexible agile and extreme project management methods have become increasingly popular among practitioners, particularly in the IT and R&D sectors. In contrast to the theoretically and algorithmically well-established and developed trade-off and multimode methods applied in traditional project management methods, flexible project scheduling methods, which are applied in agile, hybrid, and especially extreme project management, lack a principled foundation and algorithmic handling. The aim of this paper is to fill this gap. We propose a matrix-based method that provides scores for alternative project plans that host flexible task dependencies and undecided, supplementary task completion while also handling the new but unplanned tasks. In addition, traditional multimode resource-constrained project scheduling problems are also covered. The proposed method can bridge the flexible and traditional approaches.
引用
收藏
页码:211 / 241
页数:31
相关论文
共 50 条
  • [1] Multimode resource-constrained project scheduling in flexible projects
    Zsolt T. Kosztyán
    István Szalkai
    Journal of Global Optimization, 2020, 76 : 211 - 241
  • [2] Scheduling resource-constrained projects with a flexible project structure
    Kellenbrink, Carolin
    Helber, Stefan
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2015, 246 (02) : 379 - 391
  • [3] NONPREEMPTIVE MULTIMODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
    DREXL, A
    GRUENEWALD, J
    IIE TRANSACTIONS, 1993, 25 (05) : 74 - 81
  • [4] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [5] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [6] Hybrid multimode resource-constrained maintenance project scheduling problem
    Kosztyan, Zsolt T.
    Pribojszki-Nemeth, Aniko
    Szalkai, Istvan
    OPERATIONS RESEARCH PERSPECTIVES, 2019, 6
  • [7] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Menesi, Wail
    Hegazy, Tarek
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2014, 30 (03)
  • [8] Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling
    Zhang, Hong
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (02) : 150 - 159
  • [9] Flexible resource-constrained resource leveling project scheduling problem
    Yu, Xiao-Guang
    Zhan, De-Chen
    Nie, Lan-Shun
    Chu, Dian-Hui
    Xu, Xiao-Fei
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (09): : 1967 - 1976
  • [10] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135