Multimode resource-constrained project scheduling in flexible projects

被引:13
|
作者
Kosztyan, Zsolt T. [1 ]
Szalkai, Istvan [2 ]
机构
[1] Univ Pannonia, Fac Business & Econ, Dept Quantitat Methods, Egyet Str 10, Veszprem, Hungary
[2] Univ Pannonia, Fac Informat Technol, Dept Math, Egyet Str 10, Veszprem, Hungary
关键词
Multimode resource-constrained project scheduling problem; Flexible project management approaches; Matrix-based project planning; COST TRADEOFF PROBLEM; DISCRETE-TIME; OFF PROBLEMS; QUALITY; MODELS; AGILE;
D O I
10.1007/s10898-019-00832-8
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
Flexible agile and extreme project management methods have become increasingly popular among practitioners, particularly in the IT and R&D sectors. In contrast to the theoretically and algorithmically well-established and developed trade-off and multimode methods applied in traditional project management methods, flexible project scheduling methods, which are applied in agile, hybrid, and especially extreme project management, lack a principled foundation and algorithmic handling. The aim of this paper is to fill this gap. We propose a matrix-based method that provides scores for alternative project plans that host flexible task dependencies and undecided, supplementary task completion while also handling the new but unplanned tasks. In addition, traditional multimode resource-constrained project scheduling problems are also covered. The proposed method can bridge the flexible and traditional approaches.
引用
收藏
页码:211 / 241
页数:31
相关论文
共 50 条
  • [41] RESOURCE-CONSTRAINED PROJECT SCHEDULING - STATE OF ART
    HERROELEN, WS
    OPERATIONAL RESEARCH QUARTERLY, 1972, 23 (03) : 261 - +
  • [42] A matheuristic for the resource-constrained project scheduling problem
    Vanhoucke, Mario
    Coelho, Jose
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2024, 319 (03) : 711 - 725
  • [43] Influence of learning in resource-constrained project scheduling
    Van Peteghem, Vincent
    Vanhoucke, Mario
    COMPUTERS & INDUSTRIAL ENGINEERING, 2015, 87 : 569 - 579
  • [44] A SURVEY ON THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
    OZDAMAR, L
    ULUSOY, G
    IIE TRANSACTIONS, 1995, 27 (05) : 574 - 586
  • [45] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [46] Resource-Constrained Project Scheduling in Hazardous Environment
    Li, Shuai
    Zhang, Zhicong
    Hu, Kaishun
    Zhao, Shaoyong
    Yan, Xiaohui
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2266 - 2270
  • [47] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [48] Modeling of the flexible resource-constrained multi-mode project scheduling problem
    School of Management, Wuhan University of Technology, Wuhan 430070, China
    不详
    Wuhan Ligong Daxue Xuebao, 2008, 11 (176-179+188):
  • [49] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [50] HEURISTICS FOR SCHEDULING RESOURCE-CONSTRAINED PROJECTS IN MPM NETWORKS
    ZHAN, J
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1994, 76 (01) : 192 - 205