Resource-constrained Scheduling of a Real Project from the Construction Industry: A Comparison of Software Packages for Project Management

被引:4
|
作者
Trautmann, N. [1 ]
Baumann, P. [1 ]
机构
[1] Univ Bern, Dept Business Adm, Bern, Switzerland
关键词
Project management; resource-constrained scheduling; construction industry; software; ALLOCATION; MICROCOMPUTER;
D O I
10.1109/IEEM.2009.5373255
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Commercial software packages for project management apply proprietary, heuristic procedures for resource-constrained scheduling. We analyze the scheduling performance of seven such packages. Three of them offer the possibility to select the priority rule to be used for the resource-constrained scheduling procedure. The project duration obtained strongly depends on this rule. Some packages know several thousand priority rules; in general, it is impossible to predict which rule provides the best result for a given project. By analyzing 1560 projects of an internationally recognized benchmark library, we propose a set of three rules for each package. We apply these rules to a real project from the construction industry. For each of the three packages, the project duration obtained by this set of rules is among the best results for all available rules, and is shorter than the project duration obtained by the packages which do not offer alternative priority rules.
引用
收藏
页码:628 / 632
页数:5
相关论文
共 50 条
  • [21] Resource-Constrained Project Scheduling in Hazardous Environment
    Li, Shuai
    Zhang, Zhicong
    Hu, Kaishun
    Zhao, Shaoyong
    Yan, Xiaohui
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 2266 - 2270
  • [22] Extensions of the resource-constrained project scheduling problem
    Ding, Hongyan
    Zhuang, Cunbo
    Liu, Jianhua
    AUTOMATION IN CONSTRUCTION, 2023, 153
  • [23] An evolutionary algorithm for resource-constrained project scheduling
    Hindi, KS
    Yang, HB
    Fleszar, K
    IEEE TRANSACTIONS ON EVOLUTIONARY COMPUTATION, 2002, 6 (05) : 512 - 518
  • [24] Resource-constrained project scheduling by simulated annealing
    Boctor, FF
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (08) : 2335 - 2351
  • [25] Investing the Application of Resource-Constrained Project Scheduling Problem in a Single-Mode Construction Project
    Devagekar, Priyanka
    Balasubramanian, M.
    ADVANCES IN CONSTRUCTION MANAGEMENT, ACMM 2021, 2022, 191 : 513 - 522
  • [26] Simulation model for resource-constrained construction project
    Biruk, Slawomir
    Rzepecki, Lukasz
    OPEN ENGINEERING, 2019, 9 (01): : 211 - 217
  • [27] A survey in the resource-constrained project and multi-project scheduling problems
    Ben Issa, Samer
    Tu, Yiliu
    JOURNAL OF PROJECT MANAGEMENT, 2020, 5 (02) : 117 - 138
  • [28] Flexible Scheduling Approach for Resource-Constrained Project Scheduling Problems
    Liu, Shixin
    Tukel, Oya I.
    Rom, W.
    2008 7TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION, VOLS 1-23, 2008, : 3522 - +
  • [29] The Multimode Resource-Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects
    Garcia-Nieves, J. D.
    Ponz-Tienda, J. L.
    Salcedo-Bernal, A.
    Pellicer, E.
    COMPUTER-AIDED CIVIL AND INFRASTRUCTURE ENGINEERING, 2018, 33 (08) : 655 - 671
  • [30] Bi-objective Optimization for Resource-constrained Robust Construction Project Scheduling
    Wanlin Liu
    Li Ge
    Chunli Qu
    Shun Yang
    KSCE Journal of Civil Engineering, 2024, 28 : 15 - 28