Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration

被引:24
|
作者
Zou, Xin [1 ]
Fang, Shu-Cherng [2 ]
Huang, Yuan-Sheng [1 ]
Zhang, Li-Hui [3 ]
机构
[1] North China Elect Power Univ, Dept Econ Management, Baoding City 071003, Hebei, Peoples R China
[2] North Carolina State Univ, Dept Ind & Syst Engn, Raleigh, NC 27695 USA
[3] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
关键词
Time-cost trade-off; Repetitive projects; Mixed-integer programming; Scheduling;
D O I
10.1061/(ASCE)CP.1943-5487.0000641
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies a repetitive project scheduling problem considering multiple crews and fixed logic with the objective to minimize the total cost without exceeding a given deadline. Multiple crews means that an activity can be performed simultaneously in several units by hiring additional crews, whereas fixed logic indicates that for each activity the units assigned to the same crew must be performed by a fixed construction sequence. Existing research works use heuristic methods to solve the problem without formulating an explicit model for further analysis. In this paper, we adopt the mixed-integer programming approach to construct an exact model. To handle large-size problems, an approximate model with reduced number of constraints and variables is further presented. Extensive computational experiments demonstrate that the exact model is capable of finding optimal solutions for medium-size problems in a reasonable amount of time, and the approximate model produces good feasible solutions for large-size problems in an accepted length of time. (C) 2016 American Society of Civil Engineers.
引用
收藏
页数:6
相关论文
共 50 条
  • [41] An overview of the time-cost trade-off problems of project planning
    Csordas, Helga
    CREATIVE CONSTRUCTION CONFERENCE 2017, CCC 2017, 2017, 196 : 323 - 326
  • [42] Systematic solution procedure for time-cost trade-off problems
    Udosen, Udosen J.
    INTERNATIONAL JOURNAL OF INDUSTRIAL ENGINEERING-THEORY APPLICATIONS AND PRACTICE, 2007, 14 (02): : 158 - 168
  • [43] An evolutionary stochastic discrete time-cost trade-off method
    Hussein, Bahaa
    Moselhi, Osama
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (07) : 581 - 600
  • [44] New fuzzy models for time-cost trade-off problem
    Ke, Hua
    Ma, Weimin
    Gao, Xin
    Xu, Weihua
    FUZZY OPTIMIZATION AND DECISION MAKING, 2010, 9 (02) : 219 - 231
  • [45] Automated BIM schedule generation approach for solving time-cost trade-off problems
    ElMenshawy, Mohamed
    Marzouk, Mohamed
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (10) : 3346 - 3367
  • [46] A new approach to solve time-cost trade-off problem with fuzzy decision variables
    Ghazanfari, M.
    Yousefli, A.
    Ameli, M. S. Jabal
    Bozorgi-Amiri, A.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 42 (3-4): : 408 - 414
  • [47] Fuzzy-based MOGA approach to stochastic time-cost trade-off problem
    Eshtehardian, Ehsan
    Afshar, Abbas
    Abbasnia, Reza
    AUTOMATION IN CONSTRUCTION, 2009, 18 (05) : 692 - 701
  • [48] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [49] A GA-based fuzzy optimal model for time-cost trade-off in a project with resources consideration
    Parveen, Sultana
    Saha, Surajit Kumar
    International Journal of Industrial and Systems Engineering, 2013, 15 (02) : 153 - 170
  • [50] Deep Space Network Scheduling via Mixed-Integer Linear Programming
    Sabol, Alex
    Alimo, Ryan
    Kamangar, Farhad
    Madani, Ramtin
    IEEE Access, 2021, 9 : 39985 - 39994