Mixed-Integer Linear Programming Approach for Scheduling Repetitive Projects with Time-Cost Trade-Off Consideration

被引:24
|
作者
Zou, Xin [1 ]
Fang, Shu-Cherng [2 ]
Huang, Yuan-Sheng [1 ]
Zhang, Li-Hui [3 ]
机构
[1] North China Elect Power Univ, Dept Econ Management, Baoding City 071003, Hebei, Peoples R China
[2] North Carolina State Univ, Dept Ind & Syst Engn, Raleigh, NC 27695 USA
[3] North China Elect Power Univ, Sch Econ & Management, Beijing 102206, Peoples R China
关键词
Time-cost trade-off; Repetitive projects; Mixed-integer programming; Scheduling;
D O I
10.1061/(ASCE)CP.1943-5487.0000641
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
This paper studies a repetitive project scheduling problem considering multiple crews and fixed logic with the objective to minimize the total cost without exceeding a given deadline. Multiple crews means that an activity can be performed simultaneously in several units by hiring additional crews, whereas fixed logic indicates that for each activity the units assigned to the same crew must be performed by a fixed construction sequence. Existing research works use heuristic methods to solve the problem without formulating an explicit model for further analysis. In this paper, we adopt the mixed-integer programming approach to construct an exact model. To handle large-size problems, an approximate model with reduced number of constraints and variables is further presented. Extensive computational experiments demonstrate that the exact model is capable of finding optimal solutions for medium-size problems in a reasonable amount of time, and the approximate model produces good feasible solutions for large-size problems in an accepted length of time. (C) 2016 American Society of Civil Engineers.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] Improvement Optimization Algorithm for Stochastic Discrete Time-cost Trade-off Problems of Construction Projects
    Wang J.
    Tang J.
    Zhou Z.
    Han C.
    Hunan Daxue Xuebao/Journal of Hunan University Natural Sciences, 2023, 50 (07): : 229 - 238
  • [32] Novel Hybrid Method in Time-Cost Trade-Off for Resource-Constrained Construction Projects
    Albayrak, Gulcag
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (04) : 1295 - 1307
  • [33] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [34] Greedy-Heuristic-Aided Mixed-Integer Linear Programming Approach for Arrival Scheduling
    Cao, Yi
    Rathinam, Sivakumar
    Sun, Dengfeng
    JOURNAL OF AEROSPACE INFORMATION SYSTEMS, 2013, 10 (07): : 323 - 336
  • [35] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - CLOSURE
    REDA, R
    CARR, RI
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 375 - 376
  • [36] TIME-COST TRADE-OFF AMONG RELATED ACTIVITIES - DISCUSSION
    HANSCOM, GB
    WAUGH, L
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1991, 117 (02): : 374 - 375
  • [37] Multi-objective time-cost trade-off optimization for the construction scheduling with Rao algorithms
    Yilmaz, Mehmet
    Dede, Tayfun
    STRUCTURES, 2023, 48 : 798 - 808
  • [38] New fuzzy models for time-cost trade-off problem
    Hua Ke
    Weimin Ma
    Xin Gao
    Weihua Xu
    Fuzzy Optimization and Decision Making, 2010, 9 : 219 - 231
  • [39] Time-cost Trade-off Relations in Bulk Transportation Problem
    Gupta, A.
    Verma, V.
    Puri, M. C.
    Journal of Information & Optimization Sciences, 16 (02):
  • [40] A Mixed-Integer Programming Approach for Scheduling Roadworks in Urban Regions
    Vallati, Mauro
    Chrpa, Lukas
    AI 2020: ADVANCES IN ARTIFICIAL INTELLIGENCE, 2020, 12576 : 82 - 93