Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China

被引:25
|
作者
Cao, Dongping [1 ]
Shao, Shiting [1 ]
Huang, Bin [2 ]
Wang, Guangbin [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Shanghai, Peoples R China
[2] Shanghai Lujiazui Finance & Trade Zone Dev Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Building information modeling (BIM); Construction projects; Technology acceptance; Technology resistance; Chinese construction industry; BUILDING INFORMATION MODEL; USER RESISTANCE; TECHNOLOGY; ADOPTION; ANTECEDENTS; ACCEPTANCE; CAPABILITIES; PERCEPTIONS; ATTITUDES; DESIGN;
D O I
10.1108/ECAM-09-2020-0735
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Despite its great potential to improve the sustainability of architectural, engineering, construction and facility management activities, the implementation of building information modeling (BIM) in many projects has failed to achieve expected benefits due to negative behavioral responses such as user resistance. This paper aims to characterize the complexity of end user's behavioral responses to BIM implementation in construction projects using a multidimensional perspective and examines how these responses are impacted by different levels of contextual factors. Design/methodology/approach By integrating technology acceptance, resistance and adoption literature, this paper theoretically proposes a research model to characterize the associations between different dimensions of behavioral responses and different levels of contextual factors. The model is then empirically tested with survey and interview data collected from BIM-based construction projects in China. Findings The empirical results not only validate the two-dimensional view of the behavioral responses (i.e. the dimension of support/resistance that ranges from aggressive resistance to enthusiastic support, and the dimension of actual use that ranges from non-use to high use) but also provide evidence for the prevalence of ambivalent responses such as supporting but lowly using and resisting but highly using. The empirical results also provide evidence that different levels of contextual factors generally play different roles in shaping the behavioral responses. Specifically, the dimension of support/resistance is more substantially impacted by the team-level factor while the dimension of actual use of BIM is more significantly associated with the project-level factor. Originality/value While previous research on BIM adoption or implementation behaviors has primarily focused on investigating users' response from single-dimension perspectives such as acceptance or non-acceptance, this study represents an exploratory effort of using a two-dimensional view to characterize the complexity and ambivalence of end users' behavioral responses to the implementation of innovative technologies such as BIM in construction projects. This study also contributes to deepened understandings of how these different dimensions of behavioral responses are intricately shaped by different levels (i.e. individual-, team- and project-levels) of contextual factors in construction projects which are characterized as temporary and inter-organizational.
引用
收藏
页码:819 / 841
页数:23
相关论文
共 50 条
  • [41] Role of Opportunism and Trust in Construction Projects: Empirical Evidence from China
    Lu, Ping
    Qian, Lamei
    Chu, Zhaofang
    Xu, Xiaoyan
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (02)
  • [42] Identifying and assessing critical risk factors for BIM projects: Empirical study
    Chien, Kuo-Feng
    Wu, Zong-Han
    Huang, Shyh-Chang
    AUTOMATION IN CONSTRUCTION, 2014, 45 : 1 - 15
  • [43] Risk paths in BIM adoption: empirical study of China
    Zhao, Xianbo
    Wu, Peng
    Wang, Xiangyu
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2018, 25 (09) : 1170 - 1187
  • [44] BIM Use to Support the Technical Tasks in Construction Projects: A Case Study
    Abdelhameed, Wael
    Ismaeil, Esam M. H.
    BUILDINGS, 2024, 14 (06)
  • [45] AN EMPIRICAL STUDY ON THE PROBLEMS OF RUNNING DESIGN AND BUILD PROJECTS IN CONSTRUCTION
    Lam, Edmond W. M.
    Chan, Albert P. C.
    Chan, Daniel W. M.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2007, 7 (01) : 1 - 15
  • [46] An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
    Guang-she Jia
    Song-yu Yan
    Wen-jun Wang
    Ralf Müller
    Chen Lin
    Frontiers of Engineering Management, 2016, (01) : 39 - 49
  • [47] An Empirical Study on Flexibility: A Critical Success Factor of Construction Projects
    Rashmi Shahu
    Ashok K. Pundir
    L. Ganapathy
    Global Journal of Flexible Systems Management, 2012, 13 (3) : 123 - 128
  • [48] Empirical Study on the Obstacles to the Success of Joint Ventures in Construction Projects
    Lu, Chen
    Yu, Zhiwei
    Wang, Xuetong
    Hong, Yuming
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [49] An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
    Guangshe Jia
    Songyu Yan
    Wenjun Wang
    Ralf Mller
    Chen Lin
    Frontiers of Engineering Management, 2016, 3 (01) : 39 - 49
  • [50] An Empirical Study on the Generation Mechanism of NIMBY Conflicts of Construction Projects
    Jia, Guang-she
    Yan, Song-yu
    Wang, Wen-jun
    Mueller, Ralf
    Lin, Chen
    FRONTIERS OF ENGINEERING MANAGEMENT, 2016, 3 (01) : 39 - 49