Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China

被引:25
|
作者
Cao, Dongping [1 ]
Shao, Shiting [1 ]
Huang, Bin [2 ]
Wang, Guangbin [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Shanghai, Peoples R China
[2] Shanghai Lujiazui Finance & Trade Zone Dev Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Building information modeling (BIM); Construction projects; Technology acceptance; Technology resistance; Chinese construction industry; BUILDING INFORMATION MODEL; USER RESISTANCE; TECHNOLOGY; ADOPTION; ANTECEDENTS; ACCEPTANCE; CAPABILITIES; PERCEPTIONS; ATTITUDES; DESIGN;
D O I
10.1108/ECAM-09-2020-0735
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Despite its great potential to improve the sustainability of architectural, engineering, construction and facility management activities, the implementation of building information modeling (BIM) in many projects has failed to achieve expected benefits due to negative behavioral responses such as user resistance. This paper aims to characterize the complexity of end user's behavioral responses to BIM implementation in construction projects using a multidimensional perspective and examines how these responses are impacted by different levels of contextual factors. Design/methodology/approach By integrating technology acceptance, resistance and adoption literature, this paper theoretically proposes a research model to characterize the associations between different dimensions of behavioral responses and different levels of contextual factors. The model is then empirically tested with survey and interview data collected from BIM-based construction projects in China. Findings The empirical results not only validate the two-dimensional view of the behavioral responses (i.e. the dimension of support/resistance that ranges from aggressive resistance to enthusiastic support, and the dimension of actual use that ranges from non-use to high use) but also provide evidence for the prevalence of ambivalent responses such as supporting but lowly using and resisting but highly using. The empirical results also provide evidence that different levels of contextual factors generally play different roles in shaping the behavioral responses. Specifically, the dimension of support/resistance is more substantially impacted by the team-level factor while the dimension of actual use of BIM is more significantly associated with the project-level factor. Originality/value While previous research on BIM adoption or implementation behaviors has primarily focused on investigating users' response from single-dimension perspectives such as acceptance or non-acceptance, this study represents an exploratory effort of using a two-dimensional view to characterize the complexity and ambivalence of end users' behavioral responses to the implementation of innovative technologies such as BIM in construction projects. This study also contributes to deepened understandings of how these different dimensions of behavioral responses are intricately shaped by different levels (i.e. individual-, team- and project-levels) of contextual factors in construction projects which are characterized as temporary and inter-organizational.
引用
收藏
页码:819 / 841
页数:23
相关论文
共 50 条
  • [31] BIM Implementation in China: A Case Study Approach
    Bo, Jiang
    Khan, Rana Raheel Afzal
    Vian, Ahmed
    Cheng Zhijun
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY AND MANAGEMENT INNOVATION, 2015, 28 : 1106 - 1113
  • [32] Empirical study of six Swedish PDM implementation projects
    Sellgren, U
    Hakelius, C
    ADVANCES IN CONCURRENT ENGINEERING: CE96: COLLABORATIVE WORK ORGANIZATION AND MANAGEMENT PRODUCT AND PROCESS INTEGRATION PLANNING AND SCHEDULING INFORMATION AND PROCESS MODELING DATA EXCHANGE PRACTICAL APPLICATIONS, 1996, 96 : 97 - 104
  • [33] Empirical Study upon Management Collaboration in Construction Projects
    Zhen, Zhilu
    Jian, Jianru
    Zhang, Yanbin
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1647 - +
  • [34] Evaluating Social Performance of Construction Projects: An Empirical Study
    Xiahou, Xiaer
    Tang, Yuchun
    Yuan, Jingfeng
    Chang, Tengyuan
    Liu, Ping
    Li, Qiming
    SUSTAINABILITY, 2018, 10 (07)
  • [35] An empirical study of the complexity of requirements management in construction projects
    Jallow, Abdou
    Demian, Peter
    Baldwin, Andrew
    Anumba, Chimay
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2014, 21 (05) : 505 - +
  • [36] THE EFFECTS OF DELAYS IN ALGERIAN CONSTRUCTION PROJECTS: AN EMPIRICAL STUDY
    Salhi, Roumeissa
    Messaoudi, Karima
    CIVIL AND ENVIRONMENTAL ENGINEERING REPORTS, 2021, 31 (02) : 218 - 254
  • [37] Empirical study of schedule delay in Moroccan construction projects
    Bajjou, Mohamed Saad
    Chafi, Anas
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (07) : 783 - 800
  • [38] Labor waste in housing construction projects: an empirical study
    Nassri, Soraya
    Talebi, Saeed
    Elghaish, Faris
    Koohestani, Kayvan
    McIlwaine, Stephen
    Hosseini, M. Reza
    Poshdar, Mani
    Kagioglou, Michail
    SMART AND SUSTAINABLE BUILT ENVIRONMENT, 2023, 12 (02) : 325 - 340
  • [39] A system dynamic model for assessing the level of BIM implementation in construction phase: a China case study
    Tu, Bocun
    Zuo, Jian
    Chang, Rui-Dong
    Webber, Ronald J.
    Xiong, Feng
    Dong, Na
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2023, 30 (04) : 1321 - 1343
  • [40] BUILDING INFORMATION MODELLING (BIM) IMPLEMENTATION AND REMOTE CONSTRUCTION PROJECTS: ISSUES, CHALLENGES, AND CRITIQUES
    Arayici, Yusuf
    Egbu, Charles
    Coates, Paul
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2012, 17 : 75 - 91