Multidimensional behavioral responses to the implementation of BIM in construction projects: an empirical study in China

被引:25
|
作者
Cao, Dongping [1 ]
Shao, Shiting [1 ]
Huang, Bin [2 ]
Wang, Guangbin [1 ]
机构
[1] Tongji Univ, Dept Construct Management & Real Estate, Shanghai, Peoples R China
[2] Shanghai Lujiazui Finance & Trade Zone Dev Co Ltd, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Building information modeling (BIM); Construction projects; Technology acceptance; Technology resistance; Chinese construction industry; BUILDING INFORMATION MODEL; USER RESISTANCE; TECHNOLOGY; ADOPTION; ANTECEDENTS; ACCEPTANCE; CAPABILITIES; PERCEPTIONS; ATTITUDES; DESIGN;
D O I
10.1108/ECAM-09-2020-0735
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Purpose Despite its great potential to improve the sustainability of architectural, engineering, construction and facility management activities, the implementation of building information modeling (BIM) in many projects has failed to achieve expected benefits due to negative behavioral responses such as user resistance. This paper aims to characterize the complexity of end user's behavioral responses to BIM implementation in construction projects using a multidimensional perspective and examines how these responses are impacted by different levels of contextual factors. Design/methodology/approach By integrating technology acceptance, resistance and adoption literature, this paper theoretically proposes a research model to characterize the associations between different dimensions of behavioral responses and different levels of contextual factors. The model is then empirically tested with survey and interview data collected from BIM-based construction projects in China. Findings The empirical results not only validate the two-dimensional view of the behavioral responses (i.e. the dimension of support/resistance that ranges from aggressive resistance to enthusiastic support, and the dimension of actual use that ranges from non-use to high use) but also provide evidence for the prevalence of ambivalent responses such as supporting but lowly using and resisting but highly using. The empirical results also provide evidence that different levels of contextual factors generally play different roles in shaping the behavioral responses. Specifically, the dimension of support/resistance is more substantially impacted by the team-level factor while the dimension of actual use of BIM is more significantly associated with the project-level factor. Originality/value While previous research on BIM adoption or implementation behaviors has primarily focused on investigating users' response from single-dimension perspectives such as acceptance or non-acceptance, this study represents an exploratory effort of using a two-dimensional view to characterize the complexity and ambivalence of end users' behavioral responses to the implementation of innovative technologies such as BIM in construction projects. This study also contributes to deepened understandings of how these different dimensions of behavioral responses are intricately shaped by different levels (i.e. individual-, team- and project-levels) of contextual factors in construction projects which are characterized as temporary and inter-organizational.
引用
收藏
页码:819 / 841
页数:23
相关论文
共 50 条
  • [21] Feasibility study and implementation of BIM in small scale projects
    Munagala, Devi Priya
    Kone, Venkatesh
    3RD INTERNATIONAL CONFERENCE ON ADVANCES IN MECHANICAL ENGINEERING (ICAME 2020), PTS 1-6, 2020, 912
  • [22] Empirical Study to Determine Fragmentation of Construction Projects
    Alashwal, Ali Mohammed
    Fong, Patrick Sik-Wah
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2015, 141 (07)
  • [23] An empirical study on stakeholder management in construction projects
    Srinivasan, N. P.
    Dhivya, S.
    MATERIALS TODAY-PROCEEDINGS, 2020, 21 : 60 - 62
  • [24] An Empirical Study on the Influence Path of Environmental Risk Perception on Behavioral Responses In China
    Gao, Shan
    Li, Weimin
    Ling, Shuang
    Dou, Xin
    Liu, Xiaozhou
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2019, 16 (16)
  • [25] An Empirical Study of the Toxic Capsule Crisis in China: Risk Perceptions and Behavioral Responses
    Feng, Tianjun
    Keller, L. Robin
    Wu, Ping
    Xu, Yifan
    RISK ANALYSIS, 2014, 34 (04) : 698 - 710
  • [26] Employer's Information Requirements: A Case Study Implementation of BIM on the Example of Selected Construction Projects in Poland
    Zima, Krzysztof
    Mitera-Kielbasa, Ewelina
    APPLIED SCIENCES-BASEL, 2021, 11 (22):
  • [27] Potential Improvement of Building Information Modeling (BIM) Implementation in Malaysian Construction Projects
    Latiffi, Aryani Ahmad
    Mohd, Suzila
    Rakiman, Umol Syamsyul
    PRODUCT LIFECYCLE MANAGEMENT IN THE ERA OF INTERNET OF THINGS, PLM 2015, 2016, 467 : 149 - 158
  • [28] Modelling paths of risks associated with BIM implementation in architectural, engineering and construction projects
    Zhao, Xianbo
    Feng, Yingbin
    Pienaar, Josua
    O'Brien, Darryl
    ARCHITECTURAL SCIENCE REVIEW, 2017, 60 (06) : 472 - 482
  • [29] Strategic implementation of IT/IS projects in construction: a case study
    Stewart, RA
    Mohamed, S
    Daet, R
    AUTOMATION IN CONSTRUCTION, 2002, 11 (06) : 681 - 694
  • [30] A Study of the Potential of Cloud/Mobile BIM for the Management of Construction Projects
    Abanda, F. H.
    Mzyece, D.
    Oti, A. H.
    Manjia, M. B.
    APPLIED SYSTEM INNOVATION, 2018, 1 (02) : 1 - 19