BIM Use to Support the Technical Tasks in Construction Projects: A Case Study

被引:0
|
作者
Abdelhameed, Wael [1 ]
Ismaeil, Esam M. H. [2 ,3 ]
机构
[1] Appl Sci Univ, Coll Engn, Civil & Architectural Engn Dept, POB 5055, East Al Ekir, Bahrain
[2] King Faisal Univ, Coll Engn, Civil & Environm Dept, Al Hufuf 31982, Al Ahsa, Saudi Arabia
[3] Port Said Univ, Fac Engn, Architecture & Urban Planning Dept, Port Said 42526, Egypt
关键词
BIM; construction project; construction firms; technical tasks; GCC construction;
D O I
10.3390/buildings14061534
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
BIM use has proved to be inevitable in construction project phases, starting from the project initiation phase and ending with the project closeout phase. Through the use of 4D/5D/6D models in processes of the construction project such as scheduling, bills of quantities (BoQs), and environmental analysis, BIM provides massive assistance to all project participants. In addition, BIM has been utilized in facility management through the use of 7D models. These well-established benefits positively impact construction project variables: cost, time, and quality. Despite these invaluable contributions in construction projects, BIM is not extensively applied in the Gulf Cooperation Council (GCC) of Arab countries, especially in small/medium-scale construction projects. BIM use at these project scales is mainly exclusive to the design phases. The present use of BIM in GCC construction projects leads to the missing of numerous opportunities, which negatively affects project delivery methods, project timelines, and, consequently, project budgets. To shed more light on this subject, this research paper attempts to answer emerging questions, such as the following: How do BIM and other software programs support the technical team of construction projects? Do these software programs have a direct impact on construction project management, in terms of project timelines and work changes? Does BIM add unnecessary cost to the project budget? This research paper proposes four technical task groups used in construction project phases to evaluate the use of BIM and the associated software programs, namely technical work, Time and Accuracy, budget, and BoQ. These four task groups, moreover, have been ratified and are the subject of consensus by project managers and senior engineers in GCC construction projects, who provided the research primary data through interviews and field surveys. Qualitative and quantitative analyses were conducted to investigate and analyze the present status of BIM use in construction projects, and subsequently, to establish a basis to propose improvements to support the technical team of construction projects. Two approaches are proposed to overcome the obstacles that hinder BIM adoption in GCC countries. The first one is a top-down approach, in which BIM use and BIM documents are mandatory in construction projects. The second approach is a bottom-up approach, where having more BIM professionals in the GCC market will facilitate the transformation to BIM.
引用
收藏
页数:21
相关论文
共 50 条
  • [1] USE OF BIM WITH PHOTOGRAMMETRY SUPPORT IN SMALL CONSTRUCTION PROJECTS. CASE STUDY FOR COMMERCIAL FRANCHISES
    Loredo Conde, Antonio J.
    Garcia-Sanz-Calcedo, Justo
    Reyes Rodriguez, Antonio M.
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2020, 26 (06) : 513 - 523
  • [2] Practical Analysis of BIM Tasks for Modular Construction Projects in South Korea
    Lee, Myungdo
    Lee, Dongmin
    Kim, Taehoon
    Lee, Ung-Kyun
    SUSTAINABILITY, 2020, 12 (17)
  • [3] TECHNICAL FEATURES OF BIM-SERVERS FOR COLLABORATION ON BUILDING AND CONSTRUCTION PROJECTS
    Singh, Vishal
    Gu, Ning
    Wang, Xiangyu
    PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON SUSTAINABLE URBANIZATION (ICSU 2010), 2010, : 168 - 175
  • [4] Decoding the dynamics of BIM use practice in construction projects
    Hu, Yuqing
    Dossick, Carrie S.
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2024, 42 (05) : 451 - 475
  • [5] Increasing integration in construction projects: A case study on a PPP project adopting BIM
    Lehtinen, T.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2012, : 439 - 446
  • [6] Study on Technical Disclosure in Construction Based on BIM
    Xu, Ning
    Wang, Long
    CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1698 - 1701
  • [7] State of the art of the use of BIM for resolution of claims in construction projects
    Araya, F.
    REVISTA INGENIERIA DE CONSTRUCCION, 2019, 34 (03): : 299 - 306
  • [8] An Italian BIM-based portal to support collaborative design and construction A case study on an enhanced use of information relying on a classification system and computational technical datasheets
    Daniotti, Bruno
    Spagnolo, Sonia Lupica
    Mirarchi, Claudio
    Pasini, Daniela
    Pavan, Alberto
    ECAADE 2017: SHARING OF COMPUTABLE KNOWLEDGE! (SHOCK!), VOL 2, 2017, : 67 - 76
  • [9] A study on BIM implementation of construction projects for PCM during the construction phase
    Lin Y.-C.
    Lin C.-P.
    Shueh T.-S.
    Hu H.-T.
    Journal of the Chinese Institute of Civil and Hydraulic Engineering, 2020, 32 (02): : 239 - 250
  • [10] BENEFITS OF BIM IN CONSTRUCTION PROJECTS
    Vimonsatit, Vanissorn
    Foo, Alex Chai Mui
    IMPLEMENTING INNOVATIVE IDEAS IN STRUCTURAL ENGINEERING AND PROJECT MANAGEMENT, 2015, : 1133 - 1138