4D CAD work at present could be typified as "techno-construction-centric", This paper endeavours to provide a wider construction management perspective that will open up high value alternative areas for consideration Construction is a dynamic, fragmented and combative industry. There is just not a stable platform for the adoption of sophisticated tools. In addition it is usual to speak of managing for time, cost and quality which is really quite misleading. The following performance dimensions are suggested: location (planning), function aesthetics, cost, time, health and safety and environmental performance. This implies a broader, longer-term perspective beyond immediate project needs. Given the tacit-tacit emphasis of the industry, the mis-match with the explicit-explicit character of 4D CAD systems is stark Instead of accuracy and detail, coarse robustness and connectedness are needed in systems that cover the important hard and soft dimensions. The implication is that 4D CAD systems need to shift emphasis towards the tacit-explicit mode by accommodating the above wide range of hard and soft, long and short term performance dimensions (nD CAD). In parallel with this a push towards supporting explicit-tacit knowledge conversion is needed with an emphasis on richer communications. The developments suggested will create a closer fit between the characteristics of the systems and the reality experienced by those in the industry. As such it will simply make more sense for such systems to be taken up through industry pull.
引用
收藏
页码:977 / 983
页数:5
相关论文
共 50 条
  • [41] THE 4D CAD MODEL WITH FALL GUARD BOUNDARY VISUALIZATION
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2009, 16 (03): : 193 - 203
  • [42] 4D analogue modelling of transtensional pull-apart basins
    Wu, Jonathan E.
    McClay, Ken
    Whitehouse, Paul
    Dooley, Tim
    MARINE AND PETROLEUM GEOLOGY, 2009, 26 (08) : 1608 - 1623
  • [43] 4D CAD-based evaluation system for crane deployment plans in construction of nuclear power plants
    Sugimoto, Y.
    Seki, H.
    Samo, T.
    Nakamitsu, N.
    AUTOMATION IN CONSTRUCTION, 2016, 71 : 87 - 98
  • [44] Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project
    Kim, Changyoon
    Kim, Hyoungkwan
    Park, Taekwun
    Kim, Moon Kyum
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (01) : 98 - 107
  • [45] 4D, or not 4D: that is the question
    Campbell, S
    ULTRASOUND IN OBSTETRICS & GYNECOLOGY, 2002, 19 (01) : 1 - 4
  • [46] Enabling Construction 4D Topological Analysis for Effective Construction Planning
    Su, Xing
    Cai, Hubo
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2016, 30 (01)
  • [47] Improving construction planning through 4D planning
    Allen, Chris
    Smallwood, John
    JOURNAL OF ENGINEERING DESIGN AND TECHNOLOGY, 2008, 6 (01) : 7 - 20
  • [48] 4D BIM for Construction Planning and Environmental Planning
    Sheina, Svetlana
    Seraya, Ekaterina
    Krikunov, Viktor
    Saltykov, Nikita
    INTERNATIONAL SCIENCE CONFERENCE SPBWOSCE-2018: BUSINESS TECHNOLOGIES FOR SUSTAINABLE URBAN DEVELOPMENT, 2019, 110
  • [49] AN INTERACTIVE APPROACH TO COLLABORATIVE 4D CONSTRUCTION PLANNING
    Zhou, Wei
    Heesom, David
    Georgakis, Panagiotis
    Nwagboso, Christopher
    Feng, Adam
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2009, 14 : 30 - 47
  • [50] Impacts of 4D BIM on construction project performance
    Crowther, James
    Ajayi, Saheed O.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2021, 21 (07) : 724 - 737