Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project

被引:26
|
作者
Kim, Changyoon [1 ]
Kim, Hyoungkwan [1 ]
Park, Taekwun [2 ]
Kim, Moon Kyum [3 ]
机构
[1] Yonsei Univ, Sch Civil & Environm Engn, Seoul 120749, South Korea
[2] Daelim Ind Corp, Seoul 110732, South Korea
[3] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
4D CAD; Cable-stayed bridge; Civil engineering construction; VISUALIZATION; 3D; MANAGEMENT; SIMULATION;
D O I
10.1061/(ASCE)CP.1943-5487.0000074
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Four-dimensional (4D) computer-aided design (CAD) has been credited with improving construction planning procedures. The integration of three-dimensional CAD with schedule information has enabled the effective detection of design and planning flaws in many construction projects. However, the benefit of 4D CAD has been centered on architectural constructions, as other areas such as civil infrastructure have seldom been the target of 4D CAD application. This paper presents a case study in which a cable-stayed bridge construction was analyzed and modeled using the 4D graphic simulation approach. The cable-stayed bridge was chosen for the case study because it suitably represents the complex nature of modern civil infrastructure. 4D CAD models were developed at three different levels of detail: activity, discrete operation, and continuous operation. The clear definitions of the three levels of detail of 4D CAD and their application results for the cable-stayed bridge are presented herein.
引用
收藏
页码:98 / 107
页数:10
相关论文
共 50 条
  • [1] Construction Engineering of Phu My Cable-Stayed Bridge, Vietnam
    Moir, George
    Edmonds, Cohn
    Romberg, Martin
    STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (03) : 331 - 337
  • [2] Cantilever Construction Optimization of Cable-stayed Bridge with Hybrid Bridge Deck System and Building Materials in Civil Engineering
    Dai Yuwen
    Wang Youyuan
    Li Zhixue
    ADVANCED RESEARCH ON CIVIL ENGINEERING AND MATERIAL ENGINEERING, 2012, 568 : 107 - +
  • [3] CASE-STUDY OF BURLINGTON CABLE-STAYED BRIDGE
    SWIGGUM, KE
    ANDERSON, SD
    RUSSELL, JS
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1994, 120 (03): : 649 - 666
  • [4] Interactive 3D CAD for Effective Derrick Crane Operation in a Cable-Stayed Bridge Construction
    Park, Taekwun
    Kim, Moon Kyum
    Kim, Changyoon
    Kim, Hyoungkwan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2009, 135 (11) : 1261 - 1270
  • [5] Retrofit of aerodynamic cable instability on a cable-stayed bridge - Case study
    Telang, NM
    Minervino, CM
    Norton, PG
    STRUCTURAL DESIGN ISSUES: BRIDGES, OTHER STRUCTURES, AND HYDRAULICS AND HYDROLOGY, 2000, (1740): : 61 - 67
  • [6] The Applicability Study on the FRP-Concrete Composite Bridge Deck for Cable-Stayed Bridges
    Kim, Sung Tae
    Park, Sung Yong
    Cho, Keunhee
    Cho, Jeong-Rae
    Kim, Byung-Suk
    ADVANCES IN FRACTURE AND DAMAGE MECHANICS XI, 2013, 525-526 : 593 - 596
  • [7] An evaluation of the applicability of 4D CAD on construction projects
    Mahalingam, Ashwin
    Kashyap, Rahul
    Mahajan, Charudatta
    AUTOMATION IN CONSTRUCTION, 2010, 19 (02) : 148 - 159
  • [8] STUDY ON OPTIMAL CONSTRUCTION METHOD FOR LOWER BEAM OF CABLE-STAYED BRIDGE TOWERS
    Liu, Yun
    Yan, Donghuang
    Tu, Guangya
    INTERNATIONAL SYMPOSIUM ON LIFE-CYCLE PERFORMANCE OF BRIDGES AND STRUCTURES, 2010, : 1032 - 1035
  • [9] Study of Cable Balancing System to Replace Temporary Piers During Construction of Cable-Stayed Bridge
    Liu, Ming-Hu
    Meng, Fan-Chao
    Li, Guo-Liang
    Sun, Peng
    Bridge Construction, 2020, 50 (01): : 26 - 31
  • [10] Numerical Study of the Active Tendon Control of a Cable-Stayed Bridge in a Construction Phase
    El Ouni, M. H.
    Ben Kahla, N.
    SHOCK AND VIBRATION, 2014, 2014