Applicability of 4D CAD in Civil Engineering Construction: Case Study of a Cable-Stayed Bridge Project

被引:26
|
作者
Kim, Changyoon [1 ]
Kim, Hyoungkwan [1 ]
Park, Taekwun [2 ]
Kim, Moon Kyum [3 ]
机构
[1] Yonsei Univ, Sch Civil & Environm Engn, Seoul 120749, South Korea
[2] Daelim Ind Corp, Seoul 110732, South Korea
[3] Yonsei Univ, Dept Civil & Environm Engn, Seoul 120749, South Korea
关键词
4D CAD; Cable-stayed bridge; Civil engineering construction; VISUALIZATION; 3D; MANAGEMENT; SIMULATION;
D O I
10.1061/(ASCE)CP.1943-5487.0000074
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Four-dimensional (4D) computer-aided design (CAD) has been credited with improving construction planning procedures. The integration of three-dimensional CAD with schedule information has enabled the effective detection of design and planning flaws in many construction projects. However, the benefit of 4D CAD has been centered on architectural constructions, as other areas such as civil infrastructure have seldom been the target of 4D CAD application. This paper presents a case study in which a cable-stayed bridge construction was analyzed and modeled using the 4D graphic simulation approach. The cable-stayed bridge was chosen for the case study because it suitably represents the complex nature of modern civil infrastructure. 4D CAD models were developed at three different levels of detail: activity, discrete operation, and continuous operation. The clear definitions of the three levels of detail of 4D CAD and their application results for the cable-stayed bridge are presented herein.
引用
收藏
页码:98 / 107
页数:10
相关论文
共 50 条
  • [41] A study on countermeasures against wind-induced cable vibrations in cable-stayed bridge by changing vibration modes: 4th report, experimental application to an actual cable
    Nakano, Ryuji
    Kaneko, Shigehiko
    Katamura, Ryuta
    Nippon Kikai Gakkai Ronbunshu, C Hen/Transactions of the Japan Society of Mechanical Engineers, Part C, 2002, 68 (08): : 2233 - 2240
  • [42] Improvement of Link Process in 4D CAD Viewer by Using Interface Board for Construction Project Management
    Leen, Seok Kang
    Hyoun, Seong Kim
    Hyoun, Seok Moon
    Chang, Hak Kim
    2009 THIRD INTERNATIONAL CONFERENCE ON ADVANCED ENGINEERING COMPUTING AND APPLICATIONS IN SCIENCES (ADVCOMP 2009), 2009, : 83 - +
  • [43] Construction schedule simulation and its application to hydrojunctions of water diversion project based on 4D CAD
    Zhong, DH
    Liu, JM
    Fu, JQ
    Xiong, KZ
    SYSTEM SIMULATION AND SCIENTIFIC COMPUTING, VOLS 1 AND 2, PROCEEDINGS, 2005, : 400 - 405
  • [44] Bridge Carbon Emissions and Driving Factors Based on a Life-Cycle Assessment Case Study: Cable-Stayed Bridge over Hun He River in Liaoning, China
    Zhou, ZhiWu
    Alcala, Julian
    Yepes, Victor
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2020, 17 (16) : 1 - 22
  • [45] The efficient generation of 4D BIM construction schedules: A case study of the Nanterre 2 CESI project in France
    Doukari, Omar
    Seck, Boubacar
    Greenwood, David
    FRONTIERS IN BUILT ENVIRONMENT, 2022, 8
  • [46] 4D Bridge Information Modelling for management of bridge projects: a case study from India
    Vilventhan, Aneetha
    Rajadurai, R.
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2020, 10 (03) : 423 - 435
  • [47] Discussion of "Feasibility study of 4D CAD in commercial construction" by Bonsang Koo and Martin Fischer
    Christodoulou, S
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (03): : 274 - 274
  • [48] Closure to "Feasibility study of 4D CAD in commercial construction" by Bonsang Koo and Martin Fischer
    Koo, B
    Fischer, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (03): : 274 - 275
  • [49] Deep Learning-Based Minute-Scale Digital Prediction Model of Temperature-Induced Deflection of a Cable-Stayed Bridge: Case Study
    Yue, Zi-xiang
    Ding, You-liang
    Zhao, Han-wei
    JOURNAL OF BRIDGE ENGINEERING, 2021, 26 (06)
  • [50] A 4D automatic simulation tool for construction resource planning: a case study
    Li, Heng
    Chan, Greg
    Skitmore, Martin
    Huang, Ting
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2015, 22 (05) : 536 - 550