Construction management pull for 4D CAD

被引:0
|
作者
Barrett, P [1 ]
机构
[1] Univ Salford, Fac Business & Informat, Salford M5 4WT, Lancs, England
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
4D CAD work at present could be typified as "techno-construction-centric", This paper endeavours to provide a wider construction management perspective that will open up high value alternative areas for consideration Construction is a dynamic, fragmented and combative industry. There is just not a stable platform for the adoption of sophisticated tools. In addition it is usual to speak of managing for time, cost and quality which is really quite misleading. The following performance dimensions are suggested: location (planning), function aesthetics, cost, time, health and safety and environmental performance. This implies a broader, longer-term perspective beyond immediate project needs. Given the tacit-tacit emphasis of the industry, the mis-match with the explicit-explicit character of 4D CAD systems is stark Instead of accuracy and detail, coarse robustness and connectedness are needed in systems that cover the important hard and soft dimensions. The implication is that 4D CAD systems need to shift emphasis towards the tacit-explicit mode by accommodating the above wide range of hard and soft, long and short term performance dimensions (nD CAD). In parallel with this a push towards supporting explicit-tacit knowledge conversion is needed with an emphasis on richer communications. The developments suggested will create a closer fit between the characteristics of the systems and the reality experienced by those in the industry. As such it will simply make more sense for such systems to be taken up through industry pull.
引用
收藏
页码:977 / 983
页数:5
相关论文
共 50 条
  • [31] 4D dynamic construction management and visualization software: 1. Development
    Chau, KW
    Anson, M
    Zhang, JP
    AUTOMATION IN CONSTRUCTION, 2005, 14 (04) : 512 - 524
  • [32] Strategies for representation and analyses of 4D modeling applied to construction project management
    Brito, Douglas M.
    Ferreira, Emerson A. M.
    8TH NORDIC CONFERENCE ON CONSTRUCTION ECONOMICS AND ORGANIZATION, 2015, 21 : 374 - 382
  • [33] 4D CAD model updating using image processing-based construction progress monitoring
    Kim, Changyoon
    Kim, Byoungil
    Kim, Hyoungkwan
    AUTOMATION IN CONSTRUCTION, 2013, 35 : 44 - 52
  • [34] Construction schedule simulation and its application to hydrojunctions of water diversion project based on 4D CAD
    Zhong, DH
    Liu, JM
    Fu, JQ
    Xiong, KZ
    SYSTEM SIMULATION AND SCIENTIFIC COMPUTING, VOLS 1 AND 2, PROCEEDINGS, 2005, : 400 - 405
  • [35] Visualizing high-rise building construction strategies using linear scheduling and 4D CAD
    Russell, Alan
    Staub-French, Sheryl
    Tran, Ngoc
    Wong, William
    AUTOMATION IN CONSTRUCTION, 2009, 18 (02) : 219 - 236
  • [36] Modeling construction equipment in 4D simulation
    Amrollahibuki, R.
    Hammad, A.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 243 - 250
  • [37] 4D visualization of highway construction projects
    Liapi, KA
    SEVENTH INTERNATIONAL CONFERENCE ON INFORMATION VISUALIZATION, PROCEEDINGS, 2003, : 639 - 644
  • [38] Economics of 4D reservoir management
    Anderson, RN
    Boulanger, A
    Howell, JI
    JOURNAL OF PETROLEUM TECHNOLOGY, 2000, 52 (12): : 62 - 63
  • [39] 4D dynamic construction management and visualization software: 2. Site trial
    Chau, KW
    Anson, M
    De Saram, DD
    AUTOMATION IN CONSTRUCTION, 2005, 14 (04) : 525 - 536
  • [40] Enhancing Construction Management Education through 4D BIM and VR: Insights and Recommendations
    Abouelkhier, Narmin
    Shafiq, Muhammad Tariq
    Rauf, Abdul
    Alsheikh, Negmeldin
    BUILDINGS, 2024, 14 (10)