4D CAD model updating using image processing-based construction progress monitoring

被引:90
|
作者
Kim, Changyoon [1 ]
Kim, Byoungil [1 ]
Kim, Hyoungkwan [1 ]
机构
[1] Yonsei Univ, Dept Civil Engn, Seoul 120749, South Korea
基金
新加坡国家研究基金会;
关键词
3D CAD; 4D CAD; Cable-stayed bridge; Image processing; Progress monitoring; Project scheduling; APPLICABILITY; MANAGEMENT;
D O I
10.1016/j.autcon.2013.03.005
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
For a four-dimensional (4D) computer-aided design (CAD) model to be useful for users throughout a construction project, the model must be updated in a timely and accurate manner during the construction. Only when it has been properly updated can the 4D CAD model reflect the real progress of a construction site to inform managerial decision making. However, updating a 4D CAD model is time-consuming and labor-intensive because the full updating process, from site data acquisition to 4D model regeneration, is typically conducted manually. This difficulty in updating a 4D model discourages industry practitioners from actively adopting 4D models. This paper presents an image processing-based methodology for the automatic updating of a 4D CAD model. Characterized by 3D CAD-based image mask filters, color-based noise removal, and area-based progress calculation, the image processing approach provides as-built schedule information. The schedule information is then automatically integrated with an existing 3D CAD model in batch-processing modes to produce the updated 4D CAD model. The proposed methodology was applied and verified in a cable-stayed bridge construction project and is expected to facilitate the wider use of 4D CAD models in the construction industry. (c) 2013 Elsevier B.V. All rights reserved.
引用
收藏
页码:44 / 52
页数:9
相关论文
共 50 条
  • [1] 4D BIM model adaptation based on construction progress monitoring
    Sigalov, K.
    Koenig, M.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTION, 2018, : 337 - 344
  • [2] Monitoring Construction Progress Based on 4D BIM Technology
    Chen, Jingjing
    Wu, Juan
    Qu, Yan
    6TH INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SCIENCE AND CIVIL ENGINEERING, 2020, 455
  • [3] 4D model based automated construction activity monitoring
    Rebolj, D.
    Podbreznik, P.
    Babic, N. C.
    EWORK AND EBUSINESS IN ARCHITECTURE, ENGINEERING AND CONSTRUCTIO N, 2009, : 553 - 556
  • [4] Bridge construction progress monitoring using lidar and 4D design models
    Puri, Nisha
    Turkan, Yelda
    AUTOMATION IN CONSTRUCTION, 2020, 109
  • [5] An integrated safety management with construction management using 4D CAD model
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    SAFETY SCIENCE, 2010, 48 (03) : 395 - 403
  • [6] 4D CAD - Construction industry perspective
    Webb, RM
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 1042 - 1050
  • [7] Construction management pull for 4D CAD
    Barrett, P
    CONSTRUCTION CONGRESS VI, PROCEEDING: BUILDING TOGETHER FOR A BETTER TOMORROW IN AN INCREASINGLY COMPLEX WORLD, 2000, : 977 - 983
  • [8] Image processing-based monitoring of a batch flotation process
    Massinaei, M.
    Mehrshad, N.
    Hosseini, M. R.
    2013 FIRST IRANIAN CONFERENCE ON PATTERN RECOGNITION AND IMAGE ANALYSIS (PRIA), 2013,
  • [9] Automated Schedule and Progress Updating of IFC-Based 4D BIMs
    Hamledari, Hesam
    McCabe, Brenda
    Davari, Shakiba
    Shahi, Arash
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2017, 31 (04)
  • [10] Using 4D CAD to visualize the impacts of highway construction on the public
    Zanen, P. P. A.
    Hartmann, T.
    Al-Jibouri, S. H. S.
    Heijmans, H. W. N.
    AUTOMATION IN CONSTRUCTION, 2013, 32 : 136 - 144