Construction management pull for 4D CAD

被引:0
|
作者
Barrett, P [1 ]
机构
[1] Univ Salford, Fac Business & Informat, Salford M5 4WT, Lancs, England
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
4D CAD work at present could be typified as "techno-construction-centric", This paper endeavours to provide a wider construction management perspective that will open up high value alternative areas for consideration Construction is a dynamic, fragmented and combative industry. There is just not a stable platform for the adoption of sophisticated tools. In addition it is usual to speak of managing for time, cost and quality which is really quite misleading. The following performance dimensions are suggested: location (planning), function aesthetics, cost, time, health and safety and environmental performance. This implies a broader, longer-term perspective beyond immediate project needs. Given the tacit-tacit emphasis of the industry, the mis-match with the explicit-explicit character of 4D CAD systems is stark Instead of accuracy and detail, coarse robustness and connectedness are needed in systems that cover the important hard and soft dimensions. The implication is that 4D CAD systems need to shift emphasis towards the tacit-explicit mode by accommodating the above wide range of hard and soft, long and short term performance dimensions (nD CAD). In parallel with this a push towards supporting explicit-tacit knowledge conversion is needed with an emphasis on richer communications. The developments suggested will create a closer fit between the characteristics of the systems and the reality experienced by those in the industry. As such it will simply make more sense for such systems to be taken up through industry pull.
引用
收藏
页码:977 / 983
页数:5
相关论文
共 50 条
  • [21] 3D/4D CAD Applicability for Life-Cycle Facility Management
    Park, Jungjun
    Kim, Byungil
    Kim, Changyoon
    Kim, Hyoungkwan
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2011, 25 (02) : 129 - 138
  • [22] 4D Clinical Imaging for Dynamic CAD
    Lauren, Mark
    McIntyre, Frederick
    INTERNATIONAL JOURNAL OF DENTISTRY, 2013, 2013
  • [23] Application of 4D for dynamic site layout and management of construction projects
    Ma, ZY
    Shen, QP
    Zhang, JP
    AUTOMATION IN CONSTRUCTION, 2005, 14 (03) : 369 - 381
  • [24] Integrating 4D BIM and GIS for Construction Supply Chain Management
    Deng, Yichuan
    Gan, Vincent J. L.
    Das, Moumita
    Cheng, Jack C. P.
    Anumba, Chimay
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (04)
  • [25] Application of 4D visualization technology for safety management in metro construction
    Zhou, Y.
    Ding, L. Y.
    Chen, L. J.
    AUTOMATION IN CONSTRUCTION, 2013, 34 : 25 - 36
  • [26] Integrated 4D Design Change Management Model for Construction Projects
    Wang, Liannian
    Lee, Joomyung
    Nimawat, Jatin
    Han, Kevin
    Gupta, Abhinav
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2024, 150 (05)
  • [27] Discussion of "Feasibility study of 4D CAD in commercial construction" by Bonsang Koo and Martin Fischer
    Christodoulou, S
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (03): : 274 - 274
  • [28] Closure to "Feasibility study of 4D CAD in commercial construction" by Bonsang Koo and Martin Fischer
    Koo, B
    Fischer, M
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2002, 128 (03): : 274 - 275
  • [29] Development of 4D CAD-Based Real Time Progress Management System
    Jung, Deok-Gi
    Park, Jung-Lo
    Kim, Sung-Sik
    Kim, Gu-Tak
    Kim, Kyung-Hwan
    Kim, Jae-Jun
    2011 6TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCES AND CONVERGENCE INFORMATION TECHNOLOGY (ICCIT), 2012, : 462 - 465
  • [30] THE INFORMATIVE VISUALIZATION METHOD OF THE 4D CAD MODEL
    Benjaoran, Vacharapoom
    Bhokha, Sdhabhon
    SURANAREE JOURNAL OF SCIENCE AND TECHNOLOGY, 2009, 16 (02): : 113 - 125