Modelling and Simulation of Re-Entrant Flow Shop Scheduling: An Application in Semiconductor Manufacturing

被引:10
|
作者
El-Khouly, Ingy A. [1 ]
El-Kilany, Khaled S. [1 ]
El-Sayed, Aziz E. [1 ]
机构
[1] Arab Acad Sci & Technol, Coll Engn & Technol, Dept Ind & Management Engn, Alexandria, Egypt
关键词
re-entrant flow shop; dispatching rules; lot release policy; semiconductor manufacturing; modelling and simulation; MINIMIZING MAKESPAN;
D O I
10.1109/ICCIE.2009.5223754
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Modelling and simulation is repeatedly being used as an effective tool that helps in understanding the underlying behaviour of a system and the interactions of its different variables; hence, the performance of that system can be improved. In this paper, simulation is used in the scheduling of re-entrant flow shop manufacturing systems with an application in semiconductor manufacturing. The process of wafer fabrication is arguably the most technologically complex and capital intensive stage in semiconductor manufacturing. This large-scale discrete-event process is highly re-entrant, and involves hundreds of machines, restrictions, and processing steps. Therefore, production control of wafer fabrication facilities (fab), specifically scheduling, is one of the most challenging problems that this industry faces. Dispatching rules have been extensively applied to the scheduling problems in semiconductor manufacturing. Also, lot release policies are commonly used in this manufacturing setting to further improve the performance of such systems and reduce its inherent variability. A simulation model has been developed for the Intel Five-Machine Six Step Mini-Fab using the Extend (TM) simulation environment. The Mini-Fab has been selected as it captures the challenges involved in scheduling the highly re-entrant semiconductor manufacturing lines. A number of scenarios have been developed and are used to evaluate the effect of different dispatching rules and lot release policies on the selected performance measures. Results of simulation showed that the performance of the Mini-Fab can be drastically improved using a combination of dispatching rules and lot release policy.
引用
收藏
页码:211 / 216
页数:6
相关论文
共 50 条
  • [41] A bi-objective re-entrant permutation flow shop scheduling problem: minimizing the makespan and maximum tardiness
    Fasihi, Maedeh
    Tavakkoli-Moghaddam, Reza
    Jolai, Fariborz
    OPERATIONAL RESEARCH, 2023, 23 (02)
  • [42] Multi-level genetic algorithm for the resource-constrained re-entrant scheduling problem in the flow shop
    Lin, Danping
    Lee, C. K. M.
    Ho, William
    ENGINEERING APPLICATIONS OF ARTIFICIAL INTELLIGENCE, 2013, 26 (04) : 1282 - 1290
  • [43] Hybrid Flow-Shop Scheduling Problems with Missing and Re-Entrant Operations Considering Process Scheduling and Production of Energy Consumption
    Tang, Hongtao
    Zhou, Jiahao
    Shao, Yiping
    Yang, Zhixiong
    SUSTAINABILITY, 2023, 15 (10)
  • [44] Dynamic capacity modeling with multiple re-entrant workflows in semiconductor assembly manufacturing
    Tao Zhang, M
    Fu, J
    Zhu, E
    2005 IEEE INTERNATIONAL CONFERENCE ON AUTOMATION SCIENCE AND ENGINEERING (CASE), 2005, : 160 - 165
  • [45] An improved genetic algorithm for the re-entrant and flexible job-shop scheduling problem
    Zhang Mei
    Wu Kaihua
    PROCEEDINGS OF THE 28TH CHINESE CONTROL AND DECISION CONFERENCE (2016 CCDC), 2016, : 3399 - 3404
  • [46] Clustered Absolute Bottleneck Adjacent Matching Heuristic for Re-Entrant Flow Shop
    Bareduan, Salleh Ahmad
    Gani, Isstella Mengan
    4TH MECHANICAL AND MANUFACTURING ENGINEERING, PTS 1 AND 2, 2014, 465-466 : 1138 - 1143
  • [47] A study on optimization method with combinatorial auction -Application to resource allocation problem of re-entrant flow shop
    Kaihara, Toshiya
    Fujii, Nobutada
    Hasegawa, Hiroyuki
    Kurose, Shinji
    SERVICE ROBOTICS AND MECHATRONICS, 2010, : 263 - +
  • [48] Re-entrant manufacturing system scheduling based on Drum-Buffer-Rope
    Cao, Zheng-Cai
    Peng, Ya-Zhen
    Wu, Qi-Di
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2010, 16 (12): : 2668 - 2673
  • [49] Greedy simulated annealing algorithm for solving hybrid flow shop scheduling problem with re-entrant batch processing machine
    Wu XiuLi
    Cao Zheng
    2020 CHINESE AUTOMATION CONGRESS (CAC 2020), 2020, : 4907 - 4911
  • [50] Network flow modeling for flexible manufacturing systems with re-entrant lines
    Hindi, Haitharn
    Ruml, Wheeler
    PROCEEDINGS OF THE 45TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-14, 2006, : 1043 - 1050