共 50 条
- [31] Using simplified drum-buffer-rope for re-entrant flow shop scheduling in a random environment AFRICAN JOURNAL OF BUSINESS MANAGEMENT, 2011, 5 (26): : 10796 - 10810
- [33] Makespan computation for cyber manufacturing centre using bottleneck analysis: A re-entrant flow shop problem IMECS 2008: INTERNATIONAL MULTICONFERENCE OF ENGINEERS AND COMPUTER SCIENTISTS, VOLS I AND II, 2008, : 1644 - 1648
- [36] Move blocking strategy applied to re-entrant manufacturing line scheduling International Journal of Control, Automation and Systems, 2015, 13 : 410 - 418
- [39] Application of the fluid synchronization algorithm to re-entrant manufacturing lines ICIM' 2004: PROCEEDINGS OF THE SEVENTH INTERNATIONAL CONFERENCE ON INDUSTRIAL MANAGEMENT, 2004, : 96 - 101
- [40] A bi-objective re-entrant permutation flow shop scheduling problem: minimizing the makespan and maximum tardiness Operational Research, 2023, 23