Modelling and Simulation of Re-Entrant Flow Shop Scheduling: An Application in Semiconductor Manufacturing

被引:10
|
作者
El-Khouly, Ingy A. [1 ]
El-Kilany, Khaled S. [1 ]
El-Sayed, Aziz E. [1 ]
机构
[1] Arab Acad Sci & Technol, Coll Engn & Technol, Dept Ind & Management Engn, Alexandria, Egypt
关键词
re-entrant flow shop; dispatching rules; lot release policy; semiconductor manufacturing; modelling and simulation; MINIMIZING MAKESPAN;
D O I
10.1109/ICCIE.2009.5223754
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Modelling and simulation is repeatedly being used as an effective tool that helps in understanding the underlying behaviour of a system and the interactions of its different variables; hence, the performance of that system can be improved. In this paper, simulation is used in the scheduling of re-entrant flow shop manufacturing systems with an application in semiconductor manufacturing. The process of wafer fabrication is arguably the most technologically complex and capital intensive stage in semiconductor manufacturing. This large-scale discrete-event process is highly re-entrant, and involves hundreds of machines, restrictions, and processing steps. Therefore, production control of wafer fabrication facilities (fab), specifically scheduling, is one of the most challenging problems that this industry faces. Dispatching rules have been extensively applied to the scheduling problems in semiconductor manufacturing. Also, lot release policies are commonly used in this manufacturing setting to further improve the performance of such systems and reduce its inherent variability. A simulation model has been developed for the Intel Five-Machine Six Step Mini-Fab using the Extend (TM) simulation environment. The Mini-Fab has been selected as it captures the challenges involved in scheduling the highly re-entrant semiconductor manufacturing lines. A number of scenarios have been developed and are used to evaluate the effect of different dispatching rules and lot release policies on the selected performance measures. Results of simulation showed that the performance of the Mini-Fab can be drastically improved using a combination of dispatching rules and lot release policy.
引用
收藏
页码:211 / 216
页数:6
相关论文
共 50 条
  • [11] Hybrid tabu search for re-entrant permutation flow-shop scheduling problem
    Chen, Jen-Shiang
    Pan, Jason Chao-Hsien
    Wu, Chien-Kuang
    EXPERT SYSTEMS WITH APPLICATIONS, 2008, 34 (03) : 1924 - 1930
  • [12] A Lot Streaming Model for a Re-entrant Flow Shop Scheduling Problem with Missing Operations
    Hinze, Richard
    LOGISTICS MANAGEMENT, 2016, : 149 - 158
  • [13] Hybrid Simulation and GA for a Flexible Flow Shop Problem with Variable Processors and Re-entrant Flow
    Mendez-Giraldo, German
    Alvarez-Pomar, Lindsay
    Franco, Carlos
    APPLIED COMPUTER SCIENCES IN ENGINEERING, WEA 2018, PT I, 2018, 915 : 246 - 256
  • [14] A heuristic algorithm for two-machine re-entrant shop scheduling
    Drobouchevitch, IG
    Strusevich, VA
    ANNALS OF OPERATIONS RESEARCH, 1999, 86 (0) : 417 - 439
  • [15] Green re-entrant hybrid flow shop scheduling problem considering multiple time factors
    Geng K.
    Ye C.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2023, 29 (01): : 75 - 90
  • [16] Study on re-entrant flow-shop scheduling problem (optimization by mixed integer programming)
    Hino, R. (hino@mech.nagoya-u.ac.jp), 1600, Japan Society of Mechanical Engineers (79):
  • [17] Heuristic algorithms for two machine re-entrant flow shop
    Jing, Caixia
    Tang, Guochun
    Qian, Xingsan
    THEORETICAL COMPUTER SCIENCE, 2008, 400 (1-3) : 137 - 143
  • [18] Proactive maintenance scheduling in a re-entrant flow shop using Lagrangian decomposition coordination method
    Kaihara, T.
    Fujii, N.
    Tsujibe, A.
    Nonaka, Y.
    CIRP ANNALS-MANUFACTURING TECHNOLOGY, 2010, 59 (01) : 453 - 456
  • [19] Integrating analytical hierarchy process to genetic algorithm for re-entrant flow shop scheduling problem
    Lin, Danping
    Lee, C. K. M.
    Wu, Zhang
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2012, 50 (07) : 1813 - 1824
  • [20] Combined scheduling algorithm for re-entrant batch-processing machines in semiconductor wafer manufacturing
    Jia, Wenyou
    Jiang, Zhibin
    Li, You
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (06) : 1866 - 1879