Modelling and Simulation of Re-Entrant Flow Shop Scheduling: An Application in Semiconductor Manufacturing

被引:10
|
作者
El-Khouly, Ingy A. [1 ]
El-Kilany, Khaled S. [1 ]
El-Sayed, Aziz E. [1 ]
机构
[1] Arab Acad Sci & Technol, Coll Engn & Technol, Dept Ind & Management Engn, Alexandria, Egypt
关键词
re-entrant flow shop; dispatching rules; lot release policy; semiconductor manufacturing; modelling and simulation; MINIMIZING MAKESPAN;
D O I
10.1109/ICCIE.2009.5223754
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
Modelling and simulation is repeatedly being used as an effective tool that helps in understanding the underlying behaviour of a system and the interactions of its different variables; hence, the performance of that system can be improved. In this paper, simulation is used in the scheduling of re-entrant flow shop manufacturing systems with an application in semiconductor manufacturing. The process of wafer fabrication is arguably the most technologically complex and capital intensive stage in semiconductor manufacturing. This large-scale discrete-event process is highly re-entrant, and involves hundreds of machines, restrictions, and processing steps. Therefore, production control of wafer fabrication facilities (fab), specifically scheduling, is one of the most challenging problems that this industry faces. Dispatching rules have been extensively applied to the scheduling problems in semiconductor manufacturing. Also, lot release policies are commonly used in this manufacturing setting to further improve the performance of such systems and reduce its inherent variability. A simulation model has been developed for the Intel Five-Machine Six Step Mini-Fab using the Extend (TM) simulation environment. The Mini-Fab has been selected as it captures the challenges involved in scheduling the highly re-entrant semiconductor manufacturing lines. A number of scenarios have been developed and are used to evaluate the effect of different dispatching rules and lot release policies on the selected performance measures. Results of simulation showed that the performance of the Mini-Fab can be drastically improved using a combination of dispatching rules and lot release policy.
引用
收藏
页码:211 / 216
页数:6
相关论文
共 50 条
  • [21] Hierarchical modeling and control of re-entrant semiconductor manufacturing facilities
    ElAdl, MK
    Rodriguez, AA
    Tsakalis, KS
    PROCEEDINGS OF THE 35TH IEEE CONFERENCE ON DECISION AND CONTROL, VOLS 1-4, 1996, : 1736 - 1742
  • [22] Performance analysis of scheduling policies in Re-entrant manufacturing systems
    Narahari, Y
    Khan, LM
    COMPUTERS & OPERATIONS RESEARCH, 1996, 23 (01) : 37 - 51
  • [23] Feedback control for priority rules in re-entrant semiconductor manufacturing
    He, Fenglan
    Armbruster, Dieter
    Herty, Michael
    Dong, Ming
    APPLIED MATHEMATICAL MODELLING, 2015, 39 (16) : 4655 - 4664
  • [24] A reinforcement learning approach to re-entrant manufacturing system scheduling
    Liu, CC
    Jin, HY
    Tian, Y
    Yu, HB
    2001 INTERNATIONAL CONFERENCES ON INFO-TECH AND INFO-NET PROCEEDINGS, CONFERENCE A-G: INFO-TECH & INFO-NET: A KEY TO BETTER LIFE, 2001, : C280 - C285
  • [25] Mathematical modelling of multi-objective job shop scheduling with dependent setups and re-entrant operations
    Low, C. (chinyao@mail.dyu.edu.tw), 1600, Springer-Verlag London Ltd (27): : 1 - 2
  • [26] Mathematical modelling of multi-objective job shop scheduling with dependent setups and re-entrant operations
    Low, CY
    Wu, TH
    Hsu, CM
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2005, 27 (1-2): : 181 - 189
  • [27] Mathematical modelling of multi-objective job shop scheduling with dependent setups and re-entrant operations
    Chinyao Low
    Tai-Hsi Wu
    Chih-Ming Hsu
    The International Journal of Advanced Manufacturing Technology, 2005, 27 : 181 - 189
  • [28] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Lee, Carman K. M.
    Lin, Danping
    Ho, William
    Wu, Zhang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 56 (9-12): : 1105 - 1113
  • [29] Design of a genetic algorithm for bi-objective flow shop scheduling problems with re-entrant jobs
    Carman K. M. Lee
    Danping Lin
    William Ho
    Zhang Wu
    The International Journal of Advanced Manufacturing Technology, 2011, 56 : 1105 - 1113
  • [30] Research on the Re-entrant Batch Discrete Flow Shop Scheduling for Periodic Annealing Furnace as Batch Processor
    Gu T.
    Li S.
    Lin Y.
    Wu X.
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2020, 56 (02): : 220 - 232