Integrated production and outbound distribution scheduling problem with due dates

被引:0
|
作者
Yagmur, Ece [1 ]
Kesen, Saadettin Erhan [1 ]
机构
[1] Konya Tech Univ, Ind Engn, Konya, Selcuklu, Turkey
来源
DEVELOPMENTS OF ARTIFICIAL INTELLIGENCE TECHNOLOGIES IN COMPUTATION AND ROBOTICS | 2020年 / 12卷
关键词
permutation flow shop; tardiness; memetic algorithm; SYSTEM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Integrated production and outbound distribution scheduling (IPODS) problem consists of two combinatorial optimization problem which are known as "machine scheduling" and "vehicle routing" in the literature. There are many situations that will require production and distribution decisions have to be made together in the case that there is very limited time between production and distribution activities such as perishable products or products which have limited lifespan. In addition, make to order businesses based on just in time philosophy is another application area because of the zero-inventory level between the production and distribution phase. In this study, we developed a new Memetic Algorithm (MA) to obtain optimal or near-optimal solutions in a reasonable time. The performance of the algorithm is compared with the solutions of the mathematical model of the same problem studied by [1]. Computational results show that proposed MA is capable of finding optimal or near optimal solutions which are found by CPLEX in less than a minute.
引用
收藏
页码:101 / 108
页数:8
相关论文
共 50 条
  • [41] A Hybrid Genetic Algorithm for Integrated Production and Distribution Scheduling Problem with Outsourcing Allowed
    Izadi, L.
    Ahmadizar, F.
    Arkat, J.
    INTERNATIONAL JOURNAL OF ENGINEERING, 2020, 33 (11): : 2285 - 2298
  • [42] Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence
    Azeddine Cheref
    Alessandro Agnetis
    Christian Artigues
    Jean-Charles Billaut
    Journal of Scheduling, 2017, 20 : 681 - 693
  • [43] Improved estimation of distribution algorithm for the problem of single-machine scheduling with deteriorating jobs and different due dates
    Hua-Ping Wu
    Min Huang
    Computational and Applied Mathematics, 2014, 33 : 557 - 573
  • [44] Improved estimation of distribution algorithm for the problem of single-machine scheduling with deteriorating jobs and different due dates
    Wu, Hua-Pin
    Huang, Min
    COMPUTATIONAL & APPLIED MATHEMATICS, 2014, 33 (03): : 557 - 573
  • [45] Integrated scheduling of production and distribution operations
    Chen, ZL
    Vairaktarakis, GL
    MANAGEMENT SCIENCE, 2005, 51 (04) : 614 - 628
  • [46] A priority rule for scheduling shared due dates in the resource-constrained project scheduling problem
    Strahl, William R.
    Gounaris, Chrysanthos E.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 183
  • [47] Integrated Scheduling for A Multi-Product Pipeline Network with Delivery Due Dates
    Xu, Ning
    Liao, Qi
    Liang, Yongtu
    Li, Zhengbing
    Zhang, Haoran
    PROCEEDINGS OF THE 12TH INTERNATIONAL PIPELINE CONFERENCE, 2018, VOL 3, 2018,
  • [48] BICRITERIA PARALLEL MACHINES SCHEDULING PROBLEM WITH FUZZY DUE DATES BASED ON NPGA
    Yuan, Xie
    Ou, Linlin
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 597 - +
  • [49] Fuzzy due dates job shop scheduling problem based on neural network
    Xie, Y
    Xie, JY
    Li, J
    ADVANCES IN NEURAL NETWORKS - ISNN 2005, PT 1, PROCEEDINGS, 2005, 3496 : 782 - 787
  • [50] Search heuristics for a parallel machine scheduling problem with ready times and due dates
    Park, MW
    Kim, YD
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 793 - 796