Integrated production and outbound distribution scheduling problem with due dates

被引:0
|
作者
Yagmur, Ece [1 ]
Kesen, Saadettin Erhan [1 ]
机构
[1] Konya Tech Univ, Ind Engn, Konya, Selcuklu, Turkey
来源
DEVELOPMENTS OF ARTIFICIAL INTELLIGENCE TECHNOLOGIES IN COMPUTATION AND ROBOTICS | 2020年 / 12卷
关键词
permutation flow shop; tardiness; memetic algorithm; SYSTEM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Integrated production and outbound distribution scheduling (IPODS) problem consists of two combinatorial optimization problem which are known as "machine scheduling" and "vehicle routing" in the literature. There are many situations that will require production and distribution decisions have to be made together in the case that there is very limited time between production and distribution activities such as perishable products or products which have limited lifespan. In addition, make to order businesses based on just in time philosophy is another application area because of the zero-inventory level between the production and distribution phase. In this study, we developed a new Memetic Algorithm (MA) to obtain optimal or near-optimal solutions in a reasonable time. The performance of the algorithm is compared with the solutions of the mathematical model of the same problem studied by [1]. Computational results show that proposed MA is capable of finding optimal or near optimal solutions which are found by CPLEX in less than a minute.
引用
收藏
页码:101 / 108
页数:8
相关论文
共 50 条
  • [11] Coordination of Production Scheduling and Vehicle Routing Problem with Due Dates.
    Johar, F. A.
    Nordin, S. Z.
    Potts, C. N.
    ADVANCES IN INDUSTRIAL AND APPLIED MATHEMATICS, 2016, 1750
  • [12] Integrated Production and Outbound Distribution Scheduling in a Supply Chain: Research Overview and Future Directions
    Chen, Zhi-Long
    PROCEEDINGS OF THE EIGHTH INTERNATIONAL CONFERENCE ON INFORMATION AND MANAGEMENT SCIENCES, 2009, 8 : 36 - 43
  • [13] On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
    C. T. Ng
    Lingfa Lu
    Journal of Scheduling, 2012, 15 : 391 - 398
  • [14] On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time
    Ng, C. T.
    Lu, Lingfa
    JOURNAL OF SCHEDULING, 2012, 15 (03) : 391 - 398
  • [15] New computational results for integrated production and outbound distribution scheduling problems for a product with a short lifespan
    Horvath, Marko
    EURO JOURNAL ON COMPUTATIONAL OPTIMIZATION, 2024, 12
  • [16] Heuristic algorithms to minimize the total tardiness in a flow shop production and outbound distribution scheduling problem
    Quang Chieu Ta
    Billaut, Jean-Charles
    Bouquard, Jean-Louis
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 128 - 134
  • [17] Modeling uncertain multi-objective production and outbound distribution scheduling problem with customised products
    Wei, Jingjing
    Gao, Shanshan
    Liu, Ying
    INTERNATIONAL JOURNAL OF SYSTEMS SCIENCE-OPERATIONS & LOGISTICS, 2024, 11 (01)
  • [18] Integrated production and outbound distribution activities with multiple vehicles
    Yagmur, Ece
    Kesen, Saadettin Erhan
    DEVELOPMENTS OF ARTIFICIAL INTELLIGENCE TECHNOLOGIES IN COMPUTATION AND ROBOTICS, 2020, 12 : 1155 - 1162
  • [19] Production and outbound distribution scheduling: a two-agent approach
    Rohmer, Sonja
    Billaut, Jean-Charles
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 135 - 144
  • [20] A Benders decomposition-based heuristic for a production and outbound distribution scheduling problem with strict delivery constraints
    Kergosien, Y.
    Gendreau, M.
    Billaut, J. -C.
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 262 (01) : 287 - 298