共 50 条
- [23] A Single Machine Preemptive Scheduling Problem with Arbitrary Release Dates and Fuzzy Due Dates 2009 ISECS INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT, VOL II, 2009, : 474 - +
- [24] Batch Scheduling Problem with Multiple Due-dates Constraints INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2011, 10 (01): : 1 - 6
- [27] Particle Swarm Optimization for Integrated Production-Distribution Scheduling Problem 2017 3RD INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND ROBOTICS (ICCAR), 2017, : 322 - 325