Integrated production and outbound distribution scheduling problem with due dates

被引:0
|
作者
Yagmur, Ece [1 ]
Kesen, Saadettin Erhan [1 ]
机构
[1] Konya Tech Univ, Ind Engn, Konya, Selcuklu, Turkey
来源
DEVELOPMENTS OF ARTIFICIAL INTELLIGENCE TECHNOLOGIES IN COMPUTATION AND ROBOTICS | 2020年 / 12卷
关键词
permutation flow shop; tardiness; memetic algorithm; SYSTEM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Integrated production and outbound distribution scheduling (IPODS) problem consists of two combinatorial optimization problem which are known as "machine scheduling" and "vehicle routing" in the literature. There are many situations that will require production and distribution decisions have to be made together in the case that there is very limited time between production and distribution activities such as perishable products or products which have limited lifespan. In addition, make to order businesses based on just in time philosophy is another application area because of the zero-inventory level between the production and distribution phase. In this study, we developed a new Memetic Algorithm (MA) to obtain optimal or near-optimal solutions in a reasonable time. The performance of the algorithm is compared with the solutions of the mathematical model of the same problem studied by [1]. Computational results show that proposed MA is capable of finding optimal or near optimal solutions which are found by CPLEX in less than a minute.
引用
收藏
页码:101 / 108
页数:8
相关论文
共 50 条
  • [21] Robust single machine scheduling problem with uncertain job due dates for industrial mass production
    YUE Fan
    SONG Shiji
    JIA Peng
    WU Guangping
    ZHAO Han
    Journal of Systems Engineering and Electronics, 2020, 31 (02) : 350 - 358
  • [22] Robust single machine scheduling problem with uncertain job due dates for industrial mass production
    Yue Fan
    Song Shiji
    Jia Peng
    Wu Guangping
    Zhao Han
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2020, 31 (02) : 350 - 358
  • [23] A Single Machine Preemptive Scheduling Problem with Arbitrary Release Dates and Fuzzy Due Dates
    Yuan, Xie
    Ou, LinLin
    2009 ISECS INTERNATIONAL COLLOQUIUM ON COMPUTING, COMMUNICATION, CONTROL, AND MANAGEMENT, VOL II, 2009, : 474 - +
  • [24] Batch Scheduling Problem with Multiple Due-dates Constraints
    Mohri, Shintaro
    Masuda, Teruo
    Hiroakilshii
    INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2011, 10 (01): : 1 - 6
  • [25] Integrated Production-Distribution Scheduling Problem with Multiple Independent Manufacturers
    Hao, Jianhong
    Cao, Lisi
    Jiang, Dakui
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2015, 2015
  • [26] An ant colony optimization heuristic for an integrated production and distribution scheduling problem
    Chang, Yung-Chia
    Li, Vincent C.
    Chiang, Chia-Ju
    ENGINEERING OPTIMIZATION, 2014, 46 (04) : 503 - 520
  • [27] Particle Swarm Optimization for Integrated Production-Distribution Scheduling Problem
    Pornsing, Choosak
    Tharawetcharak, Pattrawet
    Jomthong, Peerapop
    Tonglim, Tongtang
    2017 3RD INTERNATIONAL CONFERENCE ON CONTROL, AUTOMATION AND ROBOTICS (ICCAR), 2017, : 322 - 325
  • [28] STOCHASTIC SCHEDULING WITH RELEASE DATES AND DUE DATES
    PINEDO, M
    OPERATIONS RESEARCH, 1983, 31 (03) : 559 - 572
  • [29] Integrated Planning and Scheduling with Due Dates in the Corrugated Board Boxes Industry
    Analia Rodriguez, Maria
    Vecchietti, Aldo
    INDUSTRIAL & ENGINEERING CHEMISTRY RESEARCH, 2013, 52 (02) : 847 - 860
  • [30] One machine scheduling problem with fuzzy random due-dates
    Itoh T.
    Ishii H.
    Fuzzy Optimization and Decision Making, 2005, 4 (1) : 71 - 78