Integrated scheduling of production and distribution operations

被引:327
|
作者
Chen, ZL [1 ]
Vairaktarakis, GL
机构
[1] Univ Maryland, Robert H Smith Sch Business, Dept Decis & Informat Technol, College Pk, MD 20742 USA
[2] Case Western Reserve Univ, Weatherhead Sch Management, Dept Operat, Cleveland, OH 44106 USA
关键词
integrated scheduling; production and distribution operations; dynamic programming; heuristic; worst-case performance analysis; asymptotic performance analysis; value of integration;
D O I
10.1287/mnsc.1040.0325
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Motivated by applications in the computer and food catering service industries, we study an integrated scheduling model of production and distribution operations. In this model, a set of jobs (i.e,, customer orders) are first processed in a processing facility (e.g., manufacturing plant or service center) and then delivered to the customers directly without intermediate inventory. The problem is to find a joint schedule of production and distribution such that an objective function that takes into account both customer service level and total distribution cost is optimized. Customer service level is measured by a function of the times when the jobs are delivered to the customers. The distribution cost of a delivery shipment consists of a fixed charge and a variable cost proportional to the total distance of the route taken by the shipment. We study two classes of problems under this integrated scheduling model. In the first class of problems, customer service is measured by the average time when the jobs are delivered to the customers; in the second class, customer service is measured by the maximum time when the jobs are delivered to the customers. Two machine configurations in the processing facility-single machine and parallel machine-are considered. For each of the problems studied, we provide an efficient exact algorithm, or a proof of intractability accompanied by a heuristic algorithm with worst-case and asymptotic performance analysis. Computational experiments demonstrate that the heuristics developed are capable of generating near-optimal solutions. We also investigate the possible benefit of using the proposed integrated model relative to a sequential model where production and distribution operations are scheduled sequentially and separately. Computational tests show that in many cases a significant benefit can be achieved by integration.
引用
收藏
页码:614 / 628
页数:15
相关论文
共 50 条
  • [1] Integrated scheduling of production and distribution operations: A review
    Center for Digital Business and Intelligent Management, School of Economics and Management, China University of Geosciences, Lumo Rd., Wuhan
    430074, China
    不详
    90010, France
    Int. J. Ind. Syst. Eng., 1 (94-122):
  • [2] Integrated scheduling of production and distribution operations in a global MTO supply chain
    He, Zhenggang
    Guo, Zhaoxia
    Wang, Junwei
    ENTERPRISE INFORMATION SYSTEMS, 2019, 13 (04) : 490 - 514
  • [3] TWO-AGENT INTEGRATED SCHEDULING OF PRODUCTION AND DISTRIBUTION OPERATIONS WITH FIXED DEPARTURE TIMES
    Zou, Yunqing
    Lin, Zhengkui
    Han, Dongya
    Cheng, T. C. Edwin
    Wu, Chin-Chia
    JOURNAL OF INDUSTRIAL AND MANAGEMENT OPTIMIZATION, 2022, 18 (02) : 985 - 1007
  • [4] Integrated production and distribution scheduling with lifespan constraints
    Christian Viergutz
    Sigrid Knust
    Annals of Operations Research, 2014, 213 : 293 - 318
  • [5] Integrated production and distribution scheduling for perishable products
    Marandi, F.
    Zegordi, S. H.
    SCIENTIA IRANICA, 2017, 24 (04) : 2105 - 2118
  • [6] Integrated production and distribution scheduling with lifespan constraints
    Viergutz, Christian
    Knust, Sigrid
    ANNALS OF OPERATIONS RESEARCH, 2014, 213 (01) : 293 - 318
  • [7] Integrated production and distribution scheduling with a perishable product
    Devapriya, Priyantha
    Ferrell, William
    Geismar, Neil
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2017, 259 (03) : 906 - 916
  • [8] Coordinated scheduling of the outsourcing, in-house production and distribution operations
    Zhong, Xueling
    Fan, Jie
    Ou, Jinwen
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (02) : 427 - 437
  • [9] Integrated production and distribution scheduling with committed delivery dates
    Zhong, Weiya
    Chen, Zhi-Long
    Chen, Ming
    OPERATIONS RESEARCH LETTERS, 2010, 38 (02) : 133 - 138
  • [10] Integrated scheduling of production and distribution with two competing agents
    Cheng, Bayi
    Gao, Junwei
    Zhou, Mi
    Chu, Wei
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2024, 75 (09) : 1826 - 1836