Integrated scheduling of production and distribution with two competing agents

被引:0
|
作者
Cheng, Bayi [1 ,2 ]
Gao, Junwei [1 ,2 ]
Zhou, Mi [1 ,2 ]
Chu, Wei [1 ,2 ]
机构
[1] Hefei Univ Technol, Sch Management, Hefei, Peoples R China
[2] Minist Educ, Hefei, Peoples R China
基金
中国国家自然科学基金;
关键词
Batch machine; two competing agents; scheduling; delivery; approximation algorithms; BATCH MACHINES; SINGLE-MACHINE; MINIMIZE; MAKESPAN; JOBS;
D O I
10.1080/01605682.2023.2277867
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This paper studies a two-agent scheduling problem on a single batch machine. Each job j has a processing time pj and a size sj. Jobs should be delivered to the agent as soon as possible. The objective is to minimize the service span of the first agent subject to an upper bound on the makespan of the other agent. We propose two approximation algorithms when jobs have identical processing times and in the general case. Then we conduct theoretical analyses to provide the provable guarantees on the performances of the algorithms. Finally, we conduct simulation analyses based on randomly generated instances to evaluate the average performances of the algorithm in the general case.
引用
收藏
页码:1826 / 1836
页数:11
相关论文
共 50 条
  • [1] Integrated production, inventory, and batch delivery scheduling with due date assignment and two competing agents
    Yin, Yunqiang
    Yang, Yongjian
    Wang, Dujuan
    Cheng, T. C. E.
    Wu, Chin-Chia
    NAVAL RESEARCH LOGISTICS, 2018, 65 (05) : 393 - 409
  • [2] Scheduling problems with two competing agents
    Agnetis, A
    Mirchandani, PB
    Pacciarelli, D
    Pacifici, A
    OPERATIONS RESEARCH, 2004, 52 (02) : 229 - 242
  • [3] A three criteria scheduling problem with two competing agents
    Yu, Shaohua
    Wu, Zigao
    COMPUTERS & INDUSTRIAL ENGINEERING, 2021, 162
  • [4] Group Scheduling with Two Competing Agents on a Single Machine
    Li, Shi-Sheng
    Chen, Ren-Xia
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2014, 31 (06)
  • [5] Scheduling Jobs of Two Competing Agents on a Single Machine
    Cheng, Chen-Yang
    Li, Shu-Fen
    Ying, Kuo-Ching
    Liu, Yu-Hsi
    IEEE ACCESS, 2019, 7 : 98702 - 98714
  • [6] A parallel-machine scheduling problem with two competing agents
    Lee, Wen-Chiung
    Chung, Yu-Hsiang
    Wang, Jen-Ya
    ENGINEERING OPTIMIZATION, 2017, 49 (06) : 962 - 975
  • [7] Integrated scheduling of production and distribution operations
    Chen, ZL
    Vairaktarakis, GL
    MANAGEMENT SCIENCE, 2005, 51 (04) : 614 - 628
  • [8] Scheduling with two competing agents to minimize total weighted earliness
    Gerstl, Enrique
    Mor, Baruch
    Mosheiov, Gur
    ANNALS OF OPERATIONS RESEARCH, 2017, 253 (01) : 227 - 245
  • [9] A just-in-time scheduling problem with two competing agents
    Byung-Cheon Choi
    Jibok Chung
    Myoung-Ju Park
    Optimization Letters, 2020, 14 : 1869 - 1886
  • [10] Scheduling with two competing agents to minimize total weighted earliness
    Enrique Gerstl
    Baruch Mor
    Gur Mosheiov
    Annals of Operations Research, 2017, 253 : 227 - 245