THE DISCRETE TIME, COST AND QUALITY TRADE-OFF PROBLEM IN PROJECT SCHEDULING: AN EFFICIENT SOLUTION METHOD BASED ON CELLDE ALGORITHM

被引:0
|
作者
Assadipour, Gh [1 ]
Iranmanesh, H. [1 ]
机构
[1] Univ Tehran, Dept Ind Engn, Tehran 14174, Iran
来源
关键词
GENETIC ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The trade-off between time, cost, and quality is one of the important problems of project management. This problem assumes that all project activities can be executed in different modes of cost, time, and quality. Thus a manager should select each activity's mode such that the project can meet the deadline with the minimum possible cost and the maximum achievable quality. As the problem is NP-hard and the objectives are in conflict with each other, a multi-objective meta-heuristic called CellDE, which is a hybrid cellular genetic algorithm, is implemented as the optimisation method. The proposed algorithm provides project managers with a set of non-dominated or Pareto-optimal solutions, and enables them to choose the best one according to their preferences. A set of problems of different sizes is generated and solved using the proposed algorithm. Three metrics are employed for evaluating the performance of the algorithm, appraising the diversity and convergence of the achieved Pareto fronts. Finally a comparison is made between CellDE and another meta-heuristic available in the literature. The results show the superiority of CellDE.
引用
收藏
页码:93 / 101
页数:9
相关论文
共 50 条
  • [21] Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling
    Tiwari S.
    Johari S.
    Journal of The Institution of Engineers (India): Series A, 2015, 96 (1) : 37 - 46
  • [22] Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
    Li, Xue
    He, Zhengwen
    Wang, Nengmin
    Vanhoucke, Mario
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2022, 43 (05) : 1173 - 1202
  • [23] Multimode time-cost-robustness trade-off project scheduling problem under uncertainty
    Xue Li
    Zhengwen He
    Nengmin Wang
    Mario Vanhoucke
    Journal of Combinatorial Optimization, 2022, 43 : 1173 - 1202
  • [24] Fuzzy trade-off of time-cost-quality in construction project and Pareto solution
    Zhang, Lianying
    Yue, Yan
    Tongji Daxue Xuebao/Journal of Tongji University, 2013, 41 (02): : 303 - 308
  • [25] Project time–cost trade-off scheduling: a hybrid optimization approach
    Hadi Mokhtari
    Abdollah Aghaie
    Javad Rahimi
    Ashkan Mozdgir
    The International Journal of Advanced Manufacturing Technology, 2010, 50 : 811 - 822
  • [26] Time-cost-quality-risk Trade-off Project Scheduling Problem in Oil and Gas Construction Projects: Fuzzy Logic and Genetic Algorithm
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2022, 16 (02) : 355 - 364
  • [27] Simplified Solution of Time-Cost Trade-off Problem for Building Constructions by Linear Scheduling
    Bettemir, Onder Halis
    Yucel, Tugay
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (02) : 293 - 309
  • [28] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Vanhoucke, Mario
    Debels, Dieter
    JOURNAL OF SCHEDULING, 2007, 10 (4-5) : 311 - 326
  • [29] A reduction tree approach for the Discrete Time/Cost Trade-Off Problem
    Van Eynde, Rob
    Vanhoucke, Mario
    COMPUTERS & OPERATIONS RESEARCH, 2022, 143
  • [30] The discrete time/cost trade-off problem: extensions and heuristic procedures
    Mario Vanhoucke
    Dieter Debels
    Journal of Scheduling, 2007, 10 : 311 - 326