THE DISCRETE TIME, COST AND QUALITY TRADE-OFF PROBLEM IN PROJECT SCHEDULING: AN EFFICIENT SOLUTION METHOD BASED ON CELLDE ALGORITHM

被引:0
|
作者
Assadipour, Gh [1 ]
Iranmanesh, H. [1 ]
机构
[1] Univ Tehran, Dept Ind Engn, Tehran 14174, Iran
来源
关键词
GENETIC ALGORITHM;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The trade-off between time, cost, and quality is one of the important problems of project management. This problem assumes that all project activities can be executed in different modes of cost, time, and quality. Thus a manager should select each activity's mode such that the project can meet the deadline with the minimum possible cost and the maximum achievable quality. As the problem is NP-hard and the objectives are in conflict with each other, a multi-objective meta-heuristic called CellDE, which is a hybrid cellular genetic algorithm, is implemented as the optimisation method. The proposed algorithm provides project managers with a set of non-dominated or Pareto-optimal solutions, and enables them to choose the best one according to their preferences. A set of problems of different sizes is generated and solved using the proposed algorithm. Three metrics are employed for evaluating the performance of the algorithm, appraising the diversity and convergence of the achieved Pareto fronts. Finally a comparison is made between CellDE and another meta-heuristic available in the literature. The results show the superiority of CellDE.
引用
收藏
页码:93 / 101
页数:9
相关论文
共 50 条
  • [31] Robust optimization models for the discrete time/cost trade-off problem
    Hazir, Oncu
    Erel, Erdal
    Gunalay, Yavuz
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2011, 130 (01) : 87 - 95
  • [32] Time-cost trade-off of construction project based on ant colony algorithm
    Xiong, Ying
    Kuang, Ya-Ping
    Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
  • [33] Project Time-Cost-Quality Trade-off Problem: A Novel Approach Based on Fuzzy Decision Making
    Keshavarz, Esmaeil
    Shoul, Abbas
    INTERNATIONAL JOURNAL OF UNCERTAINTY FUZZINESS AND KNOWLEDGE-BASED SYSTEMS, 2020, 28 (04) : 545 - 567
  • [34] Time-cost-quality-environmental impact trade-off resource-constrained project scheduling problem with DEA approach
    Banihashemi, Sayyid Ali
    Khalilzadeh, Mohammad
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2021, 28 (07) : 1979 - 2004
  • [35] Project time-cost trade-off scheduling: a hybrid optimization approach
    Mokhtari, Hadi
    Aghaie, Abdollah
    Rahimi, Javad
    Mozdgir, Ashkan
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
  • [36] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution
    Feng, Yixiong
    Lin, Xiaohua
    Tan, Jianrong
    APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
  • [37] Time, cost and quality trade-off in project management: A case study
    Asia Inst of Technology, Bangkok, Thailand
    Int J Proj Manage, 4 (249-256):
  • [38] Study on trade-off of time-cost-quality in construction project based on BIM
    Xu Yongge
    Wei Ya
    PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
  • [39] A Genetic Algorithm to Time- Cost Trade off in Project Scheduling
    Hooshyar, B.
    Rahmani, A.
    Shenasa, M.
    2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 3081 - +
  • [40] An evolutionary stochastic discrete time-cost trade-off method
    Hussein, Bahaa
    Moselhi, Osama
    CANADIAN JOURNAL OF CIVIL ENGINEERING, 2019, 46 (07) : 581 - 600