共 50 条
- [32] Time-cost trade-off of construction project based on ant colony algorithm Xitong Gongcheng Lilun yu Shijian/System Engineering Theory and Practice, 2007, 27 (03): : 105 - 111
- [35] Project time-cost trade-off scheduling: a hybrid optimization approach INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 50 (5-8): : 811 - 822
- [36] Resource Constrained Time-cost Trade-off Problem and its Genetic Algorithm Solution APPLIED MATHEMATICS & INFORMATION SCIENCES, 2013, 7 (02): : 639 - 643
- [37] Time, cost and quality trade-off in project management: A case study Int J Proj Manage, 4 (249-256):
- [38] Study on trade-off of time-cost-quality in construction project based on BIM PROCEEDINGS OF THE 2015 INTERNATIONAL CONFERENCE ON ECONOMICS, SOCIAL SCIENCE, ARTS, EDUCATION AND MANAGEMENT ENGINEERING, 2015, 38 : 864 - 870
- [39] A Genetic Algorithm to Time- Cost Trade off in Project Scheduling 2008 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION, VOLS 1-8, 2008, : 3081 - +