Tabu Search approach for Multi-Skill Resource Constrained Project Scheduling Problem

被引:0
|
作者
Skowronski, Marek E. [1 ]
Myszkowski, Pawel B. [1 ]
Adamski, Marcin [1 ]
Kwiatek, Pawel [1 ]
机构
[1] Wroclaw Univ Technol, Fac Comp Sci & Management, Inst Informat, Dept Artificial Intelligence, PL-50370 Wroclaw, Poland
来源
2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS) | 2013年
关键词
GENETIC ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article two approaches of Tabu Search in Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP) have been proposed, based on different neighbourhood generation methods. The first approach assumes swapping resources assigned to pair of tasks, while the second one proposes assigning any resource that could perform given task. Both approaches need to respect the skill constraints. The objective of this paper is to research the usability and robustness of proposed approaches in solving MS-RCPSP. Experiments have been performed using artificially created dataset instances, based on real-world instances, got from Volvo IT and verified by experienced project manager. Presented results show that Tabu Search (TS) based methods are efficient approaches that could be developed in the further work.
引用
收藏
页码:153 / 158
页数:6
相关论文
共 50 条
  • [31] Branch-and-price approach for the multi-skill project scheduling problem
    Carlos Montoya
    Odile Bellenguez-Morineau
    Eric Pinson
    David Rivreau
    Optimization Letters, 2014, 8 : 1721 - 1734
  • [32] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Peng, Jun Long
    Liu, Xiao
    Peng, Chao
    Shao, Yu
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [33] Branch-and-price approach for the multi-skill project scheduling problem
    Montoya, Carlos
    Bellenguez-Morineau, Odile
    Pinson, Eric
    Rivreau, David
    OPTIMIZATION LETTERS, 2014, 8 (05) : 1721 - 1734
  • [34] Multi-skill resource-constrained multi-modal project scheduling problem based on hybrid quantum algorithm
    Jun Long Peng
    Xiao Liu
    Chao Peng
    Yu Shao
    Scientific Reports, 13
  • [35] Multi-project scheduling problem under shared multi-skill resource constraints
    Meya Haroune
    Cheikh Dhib
    Emmanuel Neron
    Ameur Soukhal
    Hafed Mohamed Babou
    Mohamedade Farouk Nanne
    TOP, 2023, 31 : 194 - 235
  • [36] Multi-project scheduling problem under shared multi-skill resource constraints
    Haroune, Meya
    Dhib, Cheikh
    Neron, Emmanuel
    Soukhal, Ameur
    Babou, Hafed Mohamed
    Nanne, Mohamedade Farouk
    TOP, 2023, 31 (01) : 194 - 235
  • [37] Improved selection in evolutionary multi-objective optimization of multi-skill resource-constrained project scheduling problem
    Laszczyk, Maciej
    Myszkowski, Pawel B.
    INFORMATION SCIENCES, 2019, 481 : 412 - 431
  • [38] Rules Mining-Based Gene Expression Programming for the Multi-Skill Resource Constrained Project Scheduling Problem
    Hu, Min
    Chen, Zhimin
    Xia, Yuan
    Zhang, Liping
    Tang, Qiuhua
    CMES-COMPUTER MODELING IN ENGINEERING & SCIENCES, 2023, 136 (03): : 2815 - 2840
  • [39] Novel Feedback-based Operators in Solving Multi-skill Resource-Constrained Project Scheduling Problem
    Tian, Yuan
    Xiong, Tifan
    Liu, Zhenyuan
    Deng, Pengcheng
    Wan, Li
    PROCEEDINGS OF THE 32ND 2020 CHINESE CONTROL AND DECISION CONFERENCE (CCDC 2020), 2020, : 296 - 301
  • [40] Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Considering Flexible Resource Profiles
    Luo, Xu
    Guo, Shunsheng
    Du, Baigang
    Luo, Xinhao
    Guo, Jun
    APPLIED SCIENCES-BASEL, 2024, 14 (05):