Tabu Search approach for Multi-Skill Resource Constrained Project Scheduling Problem

被引:0
|
作者
Skowronski, Marek E. [1 ]
Myszkowski, Pawel B. [1 ]
Adamski, Marcin [1 ]
Kwiatek, Pawel [1 ]
机构
[1] Wroclaw Univ Technol, Fac Comp Sci & Management, Inst Informat, Dept Artificial Intelligence, PL-50370 Wroclaw, Poland
来源
2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS) | 2013年
关键词
GENETIC ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article two approaches of Tabu Search in Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP) have been proposed, based on different neighbourhood generation methods. The first approach assumes swapping resources assigned to pair of tasks, while the second one proposes assigning any resource that could perform given task. Both approaches need to respect the skill constraints. The objective of this paper is to research the usability and robustness of proposed approaches in solving MS-RCPSP. Experiments have been performed using artificially created dataset instances, based on real-world instances, got from Volvo IT and verified by experienced project manager. Presented results show that Tabu Search (TS) based methods are efficient approaches that could be developed in the further work.
引用
收藏
页码:153 / 158
页数:6
相关论文
共 50 条
  • [21] Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Huan-yu Zheng
    Ling Wang
    Xiao-long Zheng
    Soft Computing, 2017, 21 : 1537 - 1548
  • [22] Solving a real-life multi-skill resource-constrained multi-project scheduling problem
    Torba, Rahman
    Dauzere-Peres, Stephane
    Yugma, Claude
    Gallais, Cedric
    Pouzet, Juliette
    ANNALS OF OPERATIONS RESEARCH, 2024, 338 (01) : 69 - 114
  • [23] A discrete oppositional multi-verse optimization algorithm for multi-skill resource constrained project scheduling problem
    Zhu, Lei
    Lin, Jian
    Wang, Zhou-Jing
    APPLIED SOFT COMPUTING, 2019, 85
  • [24] Co-Evolutionary Algorithm solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    Kalinowski, Dawid
    PROCEEDINGS OF THE 2017 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS), 2017, : 75 - 82
  • [25] Formulation and tabu search algorithm for the resource constrained project scheduling problem
    Nonobe, K
    Ibaraki, T
    ESSAYS AND SURVEYS IN METAHEURISTICS, 2002, 15 : 557 - 588
  • [26] Teaching-learning-based optimization algorithm for multi-skill resource constrained project scheduling problem
    Zheng, Huan-yu
    Wang, Ling
    Zheng, Xiao-long
    SOFT COMPUTING, 2017, 21 (06) : 1537 - 1548
  • [27] Modeling frameworks for the multi-skill resource-constrained project scheduling problem: a theoretical and empirical comparison
    Almeida, Bernardo F.
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH, 2019, 26 (03) : 946 - 967
  • [28] Investigation of benchmark dataset for many-objective Multi-Skill Resource Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Laszczyk, Maciej
    APPLIED SOFT COMPUTING, 2022, 127
  • [29] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Myszkowski, Pawel B.
    Skowronski, Marek E.
    Olech, Lukasz P.
    Oslizlo, Krzysztof
    SOFT COMPUTING, 2015, 19 (12) : 3599 - 3619
  • [30] Hybrid ant colony optimization in solving multi-skill resource-constrained project scheduling problem
    Paweł B. Myszkowski
    Marek E. Skowroński
    Łukasz P. Olech
    Krzysztof Oślizło
    Soft Computing, 2015, 19 : 3599 - 3619