Tabu Search approach for Multi-Skill Resource Constrained Project Scheduling Problem

被引:0
|
作者
Skowronski, Marek E. [1 ]
Myszkowski, Pawel B. [1 ]
Adamski, Marcin [1 ]
Kwiatek, Pawel [1 ]
机构
[1] Wroclaw Univ Technol, Fac Comp Sci & Management, Inst Informat, Dept Artificial Intelligence, PL-50370 Wroclaw, Poland
来源
2013 FEDERATED CONFERENCE ON COMPUTER SCIENCE AND INFORMATION SYSTEMS (FEDCSIS) | 2013年
关键词
GENETIC ALGORITHM;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this article two approaches of Tabu Search in Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP) have been proposed, based on different neighbourhood generation methods. The first approach assumes swapping resources assigned to pair of tasks, while the second one proposes assigning any resource that could perform given task. Both approaches need to respect the skill constraints. The objective of this paper is to research the usability and robustness of proposed approaches in solving MS-RCPSP. Experiments have been performed using artificially created dataset instances, based on real-world instances, got from Volvo IT and verified by experienced project manager. Presented results show that Tabu Search (TS) based methods are efficient approaches that could be developed in the further work.
引用
收藏
页码:153 / 158
页数:6
相关论文
共 50 条
  • [41] Lower bounds for a multi-skill project scheduling problem
    Dhib, Cheikh
    Kooli, Anis
    Soukhal, Ameur
    Neron, Emmanuel
    OPERATIONS RESEARCH PROCEEDINGS 2011, 2012, : 471 - 476
  • [42] Multi-skill resource-constrained project scheduling problem considering overlapping: fuzzy multi-objective programming approach to a case study
    Zarei, Fateme
    Arashpour, Mehrdad
    Mirnezami, Seyed-Ali
    Shahabi-Shahamiri, Reza
    Ghasemi, Mohammad
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2024, 24 (08) : 820 - 833
  • [43] Methods to solve multi-skill project scheduling problem
    Bellenguez-Morineau, Odile
    4OR-A QUARTERLY JOURNAL OF OPERATIONS RESEARCH, 2008, 6 (01): : 85 - 88
  • [44] Methods to solve multi-skill project scheduling problem
    Odile Bellenguez-Morineau
    4OR, 2008, 6 : 85 - 88
  • [45] Multi-mode multi-skill resource-constrained project scheduling problem with differentiated pro- fessional capabilities
    Li, Chunhao
    Wang, Feng
    Chung, Tsuiping
    JOURNAL OF PROJECT MANAGEMENT, 2024, 9 (01) : 27 - 44
  • [46] Hybrid Differential Evolution and Greedy Algorithm (DEGR) for solving Multi-Skill Resource-Constrained Project Scheduling Problem
    Myszkowski, Pawel B.
    Olech, Lukasz P.
    Laszczyk, Maciej
    Skowronski, Marek E.
    APPLIED SOFT COMPUTING, 2018, 62 : 1 - 14
  • [47] A note on "branch-and-price approach for the multi-skill project scheduling problem"
    Correia, Isabel
    Saldanha-da-Gama, Francisco
    OPTIMIZATION LETTERS, 2015, 9 (06) : 1255 - 1258
  • [48] A note on “branch-and-price approach for the multi-skill project scheduling problem”
    Isabel Correia
    Francisco Saldanha-da-Gama
    Optimization Letters, 2015, 9 : 1255 - 1258
  • [49] Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm
    Li, Yang-Yuan
    Lin, Jian
    Wang, Zhou-Jing
    APPLIED INTELLIGENCE, 2022, 52 (05) : 5718 - 5738
  • [50] Multi-skill resource constrained project scheduling using a multi-objective discrete Jaya algorithm
    Yang-Yuan Li
    Jian Lin
    Zhou-Jing Wang
    Applied Intelligence, 2022, 52 : 5718 - 5738