Resource-Constrained Time-Cost Tradeoff for Repetitive Construction Projects

被引:15
|
作者
Heravi, Gholamreza [1 ]
Moridi, Saeed [1 ]
机构
[1] Univ Tehran, Sch Civil Engn, Coll Engn, Tehran 111554563, Iran
关键词
repetitive construction projects; time-cost tradeoff; multi-objective particle swarm optimization; resource constraint; line of balance; optimization; resource allocation; OPTIMIZATION; MODEL;
D O I
10.1007/s12205-019-0151-x
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The time-cost tradeoff problem is to find optimal combinations of construction options with the objective of minimizing project time and cost. In order to search for such a set of optimal solutions, the total time and cost of projects needs to be calculated properly. In repetitive construction projects (RCPs), due to division of work into several units and involvement of many resources for activities completion, scheduling is unique and more complicated. Scheduling method in this paper besides addressing common constraints such as precedence relationships, required lead time and lag distance between activities, enables project managers to consider all resources and their shortages in scheduling. To raise the practicality of model, in addition to direct and indirect costs, resource idle cost is considered as a cost element in estimating total cost of project. The time variant multi-objective particle swarm optimization is applied to find non-dominated solutions on the basis of minimizing time and cost of project. An application example is presented at the end to illustrate the performance of the model. This research presents a resource-constrained time-cost tradeoff model to find the optimal set of crew combinations for project activities in RCPs, considering time and cost simultaneously.
引用
收藏
页码:3265 / 3274
页数:10
相关论文
共 50 条
  • [21] Research on Time-Cost Optimization Model of Construction Projects
    Huang, Jian-wen
    Wang, Xing-xia
    Zhou, Yi-hong
    Huang, Jian-wen
    Wang, Xing-xia
    2008 4TH INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-31, 2008, : 7710 - +
  • [22] Time-cost relationships in Australian building construction projects
    Love, PED
    Tse, RYC
    Edwards, DJ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2005, 131 (02) : 187 - 194
  • [23] Critical Sequence Crashing Heuristic for Resource-Constrained Discrete Time-Cost Trade-Off Problem
    Sonmez, Rifat
    Iranagh, Mahdi Abbasi
    Uysal, Furkan
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2016, 142 (03)
  • [24] Scheduling of resource-constrained projects
    Zilinskas, A
    INTERFACES, 2001, 31 (04) : 133 - 135
  • [25] Scheduling of resource-constrained projects
    Wilson, J
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2001, 52 (07) : 846 - 846
  • [26] Entropy-based scheduling of resource-constrained construction projects
    Christodoulou, Symeon
    Ellinas, Georgios
    Aslani, Pooyan
    AUTOMATION IN CONSTRUCTION, 2009, 18 (07) : 919 - 928
  • [27] Modified Streamlined Optimization Algorithm for Time-Cost Tradeoff Problems of Complex Large-Scale Construction Projects
    Wang, Jia
    Han, Congji
    Li, Xinghua
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2023, 149 (05)
  • [28] A simple time-cost tradeoff algorithm
    Goyal, SK
    PRODUCTION PLANNING & CONTROL, 1996, 7 (01) : 104 - 106
  • [29] Chance-constrained time-cost tradeoff analysis considering funding variability
    Yang, IT
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2005, 131 (09): : 1002 - 1012
  • [30] A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
    Zareei, Mostafa
    Hassan-Pour, Hossein Ali
    IRANIAN JOURNAL OF MANAGEMENT STUDIES, 2015, 8 (04) : 653 - 685