共 50 条
- [31] The Influence of the Construction Technology in Time-Cost Relationships of Sewerage Projects Water Resources Management, 2018, 32 : 2753 - 2766
- [34] Resource-Constrained Multiple Projects Scheduling with the Objective of Minimizing Activities Cost 2008 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-11, 2008, : 1027 - 1032
- [36] Applying Ant Colony System to Solve Construction Time-cost Tradeoff Problem MATERIALS SCIENCE AND ENGINEERING, PTS 1-2, 2011, 179-180 : 1390 - 1395
- [38] SIMPLE CPM TIME-COST TRADEOFF ALGORITHM MANAGEMENT SCIENCE SERIES B-APPLICATION, 1975, 21 (06): : 718 - 722
- [39] THE TIME-COST TRADEOFF IN RESEARCH AND DEVELOPMENT - A REVIEW ENGINEERING COSTS AND PRODUCTION ECONOMICS, 1989, 16 (01): : 1 - 9