Scheduling of a hub reentrant job shop to minimize makespan

被引:8
|
作者
Xie, Xie [1 ]
Tang, Lixin [2 ]
Li, Yanping [1 ]
机构
[1] Shenyang Univ, Key Lab Mfg Ind & Integrated Automat, Shenyang 110044, Liaoning, Peoples R China
[2] Northeastern Univ, Liaoning Key Lab Mfg Syst & Logist, Logist Inst, Shenyang 110004, Peoples R China
关键词
Scheduling; Hub reentrant job shop; Hybrid flow shop; Worst case analysis; Heuristics; HYBRID TABU SEARCH; FLOW TIME; WAFER FABRICATION; ALGORITHMS;
D O I
10.1007/s00170-011-3204-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper focuses on a hub reentrant shop scheduling problem which is motivated by actual packing production line in the iron and steel industry. There are five operations for processing a job where three operations must be processed on a hub machine, and between any two consecutive operations on the hub machine, two operations must be processed on other two secondary machines, respectively. We mainly consider two types of the problem. The first is basic hub reentrant shop (BHRS) problem where only one machine in each secondary machine center. The second is hybrid hub reentrant shop (HHRS) problem where multiple machines in each secondary machine center. The objective is to minimize the makespan. For BHRS problem, we show that the problem is NP-hard in the strong sense. Some properties are derived for identifying an optimal schedule. Furthermore, a heuristic algorithm is proposed with the worst performance ratio 6:5, and this ratio is demonstrated tight. For HHRS problem, two well-solvable cases are proposed, respectively. Under a split condition, HHRS is equivalent to a two-stage hybrid flow shop problem. The worst case of a class of proposed algorithms is analyzed. The performance ratio is demonstrated relatively with the secondary machine numbers.
引用
收藏
页码:743 / 753
页数:11
相关论文
共 50 条
  • [21] Single machine scheduling with job delivery to minimize makespan
    Lu, Lingfa
    Yuan, Jinjiang
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2008, 25 (01) : 1 - 10
  • [22] Scheduling Flexible Flow Shop in Labeling Companies to Minimize the Makespan
    Wang, Chia-Nan
    Hsu, Hsien-Pin
    Fu, Hsin-Pin
    Nguyen Ky Phuc Phan
    Van Thanh Nguyen
    COMPUTER SYSTEMS SCIENCE AND ENGINEERING, 2022, 40 (01): : 17 - 36
  • [23] Open shop scheduling problem to minimize makespan with release dates
    Bai, Danyu
    Tang, Lixin
    APPLIED MATHEMATICAL MODELLING, 2013, 37 (04) : 2008 - 2015
  • [24] Heuristic Model for Dynamic Single Machine Group Scheduling in Laser Cutting Job Shop to Minimize the Makespan
    Ying, Nyeoh Cheng
    Bin Mokhtar, Mohzani
    MANUFACTURING SCIENCE AND TECHNOLOGY, PTS 1-8, 2012, 383-390 : 6236 - +
  • [25] Flow-shop scheduling with exact delays to minimize makespan
    Khatami, Mostafa
    Salehipour, Amir
    Cheng, T. C. E.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 183
  • [26] Optimizing makespan and stability risks in job shop scheduling
    Wu, Zigao
    Sun, Shudong
    Yu, Shaohua
    COMPUTERS & OPERATIONS RESEARCH, 2020, 122 (122)
  • [27] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    Yan He
    Fei Liu
    Hua-jun Cao
    Cong-bo Li
    Journal of Central South University of Technology, 2005, 12 : 167 - 171
  • [28] A Local and Global Search Combine Particle Swarm Optimization Algorithm for Job-Shop Scheduling to Minimize Makespan
    Lian, Zhigang
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2010, 2010
  • [29] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    He, Y
    Liu, F
    Cao, HJ
    Li, CB
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2005, 12 (2): : 167 - 171
  • [30] Unbounded parallel batch scheduling with job delivery to minimize makespan
    Lu, Lingfa
    Yuan, Jinjiang
    OPERATIONS RESEARCH LETTERS, 2008, 36 (04) : 477 - 480