Scheduling of a hub reentrant job shop to minimize makespan

被引:8
|
作者
Xie, Xie [1 ]
Tang, Lixin [2 ]
Li, Yanping [1 ]
机构
[1] Shenyang Univ, Key Lab Mfg Ind & Integrated Automat, Shenyang 110044, Liaoning, Peoples R China
[2] Northeastern Univ, Liaoning Key Lab Mfg Syst & Logist, Logist Inst, Shenyang 110004, Peoples R China
关键词
Scheduling; Hub reentrant job shop; Hybrid flow shop; Worst case analysis; Heuristics; HYBRID TABU SEARCH; FLOW TIME; WAFER FABRICATION; ALGORITHMS;
D O I
10.1007/s00170-011-3204-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper focuses on a hub reentrant shop scheduling problem which is motivated by actual packing production line in the iron and steel industry. There are five operations for processing a job where three operations must be processed on a hub machine, and between any two consecutive operations on the hub machine, two operations must be processed on other two secondary machines, respectively. We mainly consider two types of the problem. The first is basic hub reentrant shop (BHRS) problem where only one machine in each secondary machine center. The second is hybrid hub reentrant shop (HHRS) problem where multiple machines in each secondary machine center. The objective is to minimize the makespan. For BHRS problem, we show that the problem is NP-hard in the strong sense. Some properties are derived for identifying an optimal schedule. Furthermore, a heuristic algorithm is proposed with the worst performance ratio 6:5, and this ratio is demonstrated tight. For HHRS problem, two well-solvable cases are proposed, respectively. Under a split condition, HHRS is equivalent to a two-stage hybrid flow shop problem. The worst case of a class of proposed algorithms is analyzed. The performance ratio is demonstrated relatively with the secondary machine numbers.
引用
收藏
页码:743 / 753
页数:11
相关论文
共 50 条
  • [31] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    何彦
    刘飞
    曹华军
    李聪波
    Journal of Central South University, 2005, (S2) : 167 - 171
  • [32] Flexible flow shop scheduling problem to minimize makespan with renewable resources
    Abbaszadeh, N.
    Asadi-Gangraj, E.
    Emami, S.
    SCIENTIA IRANICA, 2021, 28 (03) : 1853 - 1870
  • [33] An efficient method for no-wait flow shop scheduling to minimize makespan
    Li, Xiaoping
    Wang, Qian
    Wu, Cheng
    2006 10TH INTERNATIONAL CONFERENCE ON COMPUTER SUPPORTED COOPERATIVE WORK IN DESIGN, PROCEEDINGS, VOLS 1 AND 2, 2006, : 1296 - 1301
  • [34] Flexible flow shop scheduling problem to minimize makespan with renewable resources
    Abbaszadeh N.
    Asadi-Gangraj E.
    Emami S.
    Asadi-Gangraj, Ebrahim (e.asadi@nit.ac.ir), 1853, Sharif University of Technology (28): : 1853 - 1870
  • [35] An improved NEH heuristic to minimize makespan for flow shop scheduling problems
    Sharma, Meenakshi
    Sharma, Manisha
    Sharma, Sameer
    DECISION SCIENCE LETTERS, 2021, 10 (03) : 311 - 322
  • [36] An effective genetic algorithm for flow shop scheduling problems to minimize makespan
    Robert, R. B. Jeen
    Rajkumar, R.
    MECHANIKA, 2017, 23 (04): : 594 - 603
  • [37] An Adaptive Differential Evolution Algorithm for Flow Shop Scheduling to minimize makespan
    Zhou, Yanping
    INFORMATION TECHNOLOGY APPLICATIONS IN INDUSTRY II, PTS 1-4, 2013, 411-414 : 2089 - 2092
  • [38] A hybrid algorithm to minimize makespan for the permutation flow shop scheduling problem
    Ahmadizar, Fardin
    Barzinpour, Farnaz
    INTERNATIONAL JOURNAL OF COMPUTATIONAL INTELLIGENCE SYSTEMS, 2010, 3 (06) : 853 - 861
  • [39] A Genetic Algorithm for Flow Shop Scheduling with Assembly Operations to Minimize Makespan
    Bhongade A.S.
    Khodke P.M.
    Bhongade, A.S. (ajay_bhongade@rediffmail.com), 1600, Springer (95): : 89 - 96
  • [40] Minimizing makespan for scheduling stochastic job shop with random breakdown
    Lei, De-ming
    APPLIED MATHEMATICS AND COMPUTATION, 2012, 218 (24) : 11851 - 11858