Scheduling of a hub reentrant job shop to minimize makespan

被引:8
|
作者
Xie, Xie [1 ]
Tang, Lixin [2 ]
Li, Yanping [1 ]
机构
[1] Shenyang Univ, Key Lab Mfg Ind & Integrated Automat, Shenyang 110044, Liaoning, Peoples R China
[2] Northeastern Univ, Liaoning Key Lab Mfg Syst & Logist, Logist Inst, Shenyang 110004, Peoples R China
关键词
Scheduling; Hub reentrant job shop; Hybrid flow shop; Worst case analysis; Heuristics; HYBRID TABU SEARCH; FLOW TIME; WAFER FABRICATION; ALGORITHMS;
D O I
10.1007/s00170-011-3204-y
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper focuses on a hub reentrant shop scheduling problem which is motivated by actual packing production line in the iron and steel industry. There are five operations for processing a job where three operations must be processed on a hub machine, and between any two consecutive operations on the hub machine, two operations must be processed on other two secondary machines, respectively. We mainly consider two types of the problem. The first is basic hub reentrant shop (BHRS) problem where only one machine in each secondary machine center. The second is hybrid hub reentrant shop (HHRS) problem where multiple machines in each secondary machine center. The objective is to minimize the makespan. For BHRS problem, we show that the problem is NP-hard in the strong sense. Some properties are derived for identifying an optimal schedule. Furthermore, a heuristic algorithm is proposed with the worst performance ratio 6:5, and this ratio is demonstrated tight. For HHRS problem, two well-solvable cases are proposed, respectively. Under a split condition, HHRS is equivalent to a two-stage hybrid flow shop problem. The worst case of a class of proposed algorithms is analyzed. The performance ratio is demonstrated relatively with the secondary machine numbers.
引用
收藏
页码:743 / 753
页数:11
相关论文
共 50 条
  • [11] A modified shifting bottleneck heuristic for the reentrant job shop scheduling problem with makespan minimization
    Topaloglu, Seyda
    Kilincli, Gamze
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 44 (7-8): : 781 - 794
  • [12] A similar particle swarm optimization algorithm for job-shop scheduling to minimize makespan
    Lian, Zhigang
    Jiao, Bin
    Gu, Xingsheng
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 183 (02) : 1008 - 1017
  • [13] A novel discrete PSO algorithm for solving job shop scheduling problem to minimize makespan
    Rameshkumar, K.
    Rajendran, C.
    INTERNATIONAL CONFERENCE ON ADVANCES IN MATERIALS AND MANUFACTURING APPLICATIONS (ICONAMMA-2017), 2018, 310
  • [14] Two-Machine Job-Shop Scheduling Problem to Minimize the Makespan with Uncertain Job Durations
    Sotskov, Yuri N.
    Matsveichuk, Natalja M.
    Hatsura, Vadzim D.
    ALGORITHMS, 2020, 13 (01)
  • [15] Flexible open shop scheduling problem to minimize makespan
    Bai, Danyu
    Zhang, Zhi-Hai
    Zhang, Qiang
    COMPUTERS & OPERATIONS RESEARCH, 2016, 67 : 207 - 215
  • [16] An asymptotically optimal algorithm for large-scale mixed job shop scheduling to minimize the makespan
    Gu, Manzhan
    Lu, Xiwen
    Gu, Jinwei
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2017, 33 (02) : 473 - 495
  • [17] An asymptotically optimal algorithm for large-scale mixed job shop scheduling to minimize the makespan
    Manzhan Gu
    Xiwen Lu
    Jinwei Gu
    Journal of Combinatorial Optimization, 2017, 33 : 473 - 495
  • [18] Flow shop scheduling to minimize makespan with decreasing time-dependent job processing times
    Wang, Xiao-Yuan
    Wang, Ming-Zheng
    Wang, Ji-Bo
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 60 (04) : 840 - 844
  • [19] A Comparison of Artificial Bee Colony algorithm and Genetic Algorithm to minimize the makespan for Job Shop Scheduling
    Muthiah, A.
    Rajkumar, R.
    12TH GLOBAL CONGRESS ON MANUFACTURING AND MANAGEMENT (GCMM - 2014), 2014, 97 : 1745 - 1754
  • [20] A variable neighborhood search for job shop scheduling with set-up times to minimize makespan
    Roshanaei, V.
    Naderi, B.
    Jolai, F.
    Khalili, M.
    FUTURE GENERATION COMPUTER SYSTEMS-THE INTERNATIONAL JOURNAL OF ESCIENCE, 2009, 25 (06): : 654 - 661