A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan

被引:0
|
作者
Yan He
Fei Liu
Hua-jun Cao
Cong-bo Li
机构
[1] Chongqing University,Institute of Green Manufacturing Technology
关键词
green manufacturing; job-shop scheduling; tabu search; energy-saving; TH186;
D O I
暂无
中图分类号
学科分类号
摘要
The issue of reducing energy consumption for the job-shop scheduling problem in machining systems is addressed, whose dual objectives are to minimize both the energy consumption and the makespan. First, the biobjective model for the job-shop scheduling problem is proposed. The objective function value of the model represents synthesized optimization of energy consumption and makespan. Then, a heuristic algorithm is developed to locate the optimal or near optimal solutions of the model based on the Tabu search mechanism. Finally, the experimental case is presented to demonstrate the effectiveness of the proposed model and the algorithm.
引用
收藏
页码:167 / 171
页数:4
相关论文
共 50 条
  • [1] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    He, Y
    Liu, F
    Cao, HJ
    Li, CB
    JOURNAL OF CENTRAL SOUTH UNIVERSITY OF TECHNOLOGY, 2005, 12 (2): : 167 - 171
  • [2] A bi-objective model for job-shop scheduling problem to minimize both energy consumption and makespan
    何彦
    刘飞
    曹华军
    李聪波
    Journal of Central South University, 2005, (S2) : 167 - 171
  • [3] A Hybrid Nested Partitions Method for Bi-objective Job Shop Scheduling Problem Considering Energy Consumption and Makespan
    Dai, Mei
    Li, Xin
    Mao, Limin
    ADVANCED MANUFACTURING AND AUTOMATION VII, 2018, 451 : 563 - 571
  • [4] Bi-Objective Flexible Job-Shop Scheduling Problem Considering Energy Consumption under Stochastic Processing Times
    Yang, Xin
    Zeng, Zhenxiang
    Wang, Ruidong
    Sun, Xueshan
    PLOS ONE, 2016, 11 (12):
  • [5] Bi-objective identical parallel machine scheduling to minimize total energy consumption and makespan
    Wang, Shijin
    Wang, Xiaodong
    Yu, Jianbo
    Ma, Shuan
    Liu, Ming
    JOURNAL OF CLEANER PRODUCTION, 2018, 193 : 424 - 440
  • [6] Two-Machine Job-Shop Scheduling Problem to Minimize the Makespan with Uncertain Job Durations
    Sotskov, Yuri N.
    Matsveichuk, Natalja M.
    Hatsura, Vadzim D.
    ALGORITHMS, 2020, 13 (01)
  • [7] Bi-objective optimisation approaches to Job-shop problem with power requirements
    Gondran, Matthieu
    Kemmoe, Sylverin
    Lamy, Damien
    Tchernev, Nikolay
    EXPERT SYSTEMS WITH APPLICATIONS, 2020, 162
  • [8] A Bi-objective Model for Dual-resource Constrained Job Shop Scheduling with the Consideration of Energy Consumption
    Zheng, Feifeng
    Sui, Yang
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 118 - 123
  • [9] RNN Modelling for Bi-objective MPM Job Shop Scheduling Problem
    Tselios, Dimitrios
    Savvas, Ilias
    Kechadi, M-Tahar
    2013 FIFTH INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE, COMMUNICATION SYSTEMS AND NETWORKS (CICSYN), 2013, : 13 - 18
  • [10] Study on Multi-objective Flexible Job-shop Scheduling Problem considering Energy Consumption
    Jiang, Zengqiang
    Zuo, Le
    Mingcheng E
    JOURNAL OF INDUSTRIAL ENGINEERING AND MANAGEMENT-JIEM, 2014, 7 (03): : 589 - 604