Bi-Objective Scheduling Optimization for Discrete Time/Cost Trade-Off in Projects

被引:10
|
作者
Li, Hongbo [1 ]
Xu, Zhe [2 ]
Wei, Wenchao [3 ]
机构
[1] Shanghai Univ, Sch Management, Shanghai 200444, Peoples R China
[2] Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China
[3] Beijing Jiaotong Univ, Sch Econ & Management, Beijing 100044, Peoples R China
基金
美国国家科学基金会;
关键词
bi-objective optimization; heuristics; discrete time/cost trade-off; project scheduling; GENETIC ALGORITHM; TIME; COST; MODEL;
D O I
10.3390/su10082802
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In sustainable project management, time and cost are two critical factors affecting the success of a project. Time/cost trade-offs in projects accelerate the execution of some activities by increasing the amount of non-renewable resources committed to them and therefore shorten the project duration. The discrete time/cost trade-off problem (DTCTP) has been extensively studied during the past 20 years. However, due to its complexity, the DTCTP-especially the DTCTP curve problem (DTCTP-C)-has only been solved for relatively small instances. To the best of our knowledge, there is no computational performance analysis for solving the DTCTP-C on large project instances with up to 500 activities. This paper aims to fill this gap. We present two bi-objective heuristic algorithms for the DTCTP-C where both project duration and cost are minimized. The objective is to obtain a good appropriate efficient set for the large-scale instances. The first algorithm is based on the non-dominated sorting genetic algorithm II (NSGA-II) and uses a specially designed critical path-based crossover operator. The second algorithm is a steepest descent heuristic which generates efficient solutions by iteratively solving the DTCTP with different deadlines. Computational experiments are conducted to validate the proposed algorithms on a large set of randomly generated problem instances.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Robust Proactive Project Scheduling Model for the Stochastic Discrete Time/Cost Trade-Off Problem
    Li, Hongbo
    Xu, Zhe
    Xiong, Li
    Liu, Yinbin
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [22] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Vedat Toğan
    M. Azim Eirgash
    KSCE Journal of Civil Engineering, 2019, 23 : 10 - 20
  • [23] Time-Cost Trade-off Optimization of Construction Projects using Teaching Learning Based Optimization
    Togan, Vedat
    Eirgash, M. Azim
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (01) : 10 - 20
  • [24] Cost -time trade-off efficient workflow scheduling in cloud
    Mboula, Jean Etienne Ndamlabin
    Kamla, Vivient Corneille
    Djamegni, Clementin Tayou
    SIMULATION MODELLING PRACTICE AND THEORY, 2020, 103
  • [25] Multi-objective Genetic Algorithm for the Time, Cost, and Quality Trade-Off Analysis in Construction Projects
    Bragadin, Marco Alvise
    Pozzi, Luca
    Kahkonen, Kalle
    SDGS IN CONSTRUCTION ECONOMICS AND ORGANIZATION, CREON 2022, 2023, : 193 - 207
  • [26] Time-cost trade-off optimization model for retrofitting planning projects using MOGA
    Patil A.S.
    Agarwal A.K.
    Sharma K.
    Trivedi M.K.
    Asian Journal of Civil Engineering, 2024, 25 (5) : 3823 - 3833
  • [27] Optimization of environmental impacts of construction projects: a time-cost-quality trade-off approach
    Banihashemi, S. A.
    Khalilzadeh, Mohammad
    Shahraki, A.
    Malkhalifeh, M. Rostami
    Ahmadizadeh, S. S. R.
    INTERNATIONAL JOURNAL OF ENVIRONMENTAL SCIENCE AND TECHNOLOGY, 2021, 18 (03) : 631 - 646
  • [28] Bi-objective Discrete Graphical Model Optimization
    Buchet, Samuel
    Allouche, David
    de Givry, Simon
    Schiex, Thomas
    INTEGRATION OF CONSTRAINT PROGRAMMING, ARTIFICIAL INTELLIGENCE, AND OPERATIONS RESEARCH, PT I, CPAIOR 2024, 2024, 14742 : 136 - 152
  • [29] Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling
    Tiwari S.
    Johari S.
    Journal of The Institution of Engineers (India): Series A, 2015, 96 (1) : 37 - 46
  • [30] Pareto-optimal front generation for the bi-objective JIT scheduling problems with a piecewise linear trade-off between objectives
    Babu, Sona
    Girish, B. S.
    OPERATIONS RESEARCH PERSPECTIVES, 2024, 12